An administrator is managing a4-node clusterwithdifferent hardware generations:
Two G5 Nodes→ 2 CPUs (12 cores), 1 SSD (1.92 TB), 2 HDDs (4 TB).
Two G7 Nodes→ 2 CPUs (16 cores), 2 SSDs (1.92 TB), 4 HDDs (4 TB).
The cluster will bedecommissioned from productionand used forDisaster Recovery (DR) purposeswithan RPO of 1 hour.
What is the best approach when replacing G5 nodes without impacting performance?
An administrator is receiving repeated approval requests to delete a protected snapshot that has already been approved.
What is the likely cause?
An administrator wants tolive-migrate a vGPU-enabled VMfrom one host to another within the same cluster.
What requirements must be met before initiating the migration?
An administrator has been tasked with justifyingwhy Nutanix Disaster Recoverywas chosen for amulti-tier application spanning multiple business units.
What is the most efficient way to organize and manage the workloads?
An administrator would like to plan for new project-related growth.
New project workload requirements have been included for a cluster named ClusterXYZ:
· 2 Medium Sized SQL Servers
· 10 VMs with 16Gb RAM, 4 vCPU, 100GB Storage
Which two additional information items should be added to the capacity planning scenario to provide a proper capacity runway expectation? (Choose two.)