The design of a 10-story residential building features a curtain wall system on all four elevations. Due to diurnal temperature swings in the area, the curtain wall will need a thermal break to prevent the transfer of heat into the building.

Click on the thermal break in the pressure-plate mullion detail.

Refer to the exhibit.

What set of conductors should the building fluorescent Lighting be connected to?

A.

A, B

B.

C, A, B

C.

C,N

D.

C,A,N

Refer to the exhibit.

What is an accurate description of the air distribution system shown?

A.

Ducted supply and return air is utilized.

B.

Supply air is delivered at a low velocity.

C.

The system is inefficient in summer months.

D.

The system prohibits individual comfort control.

A wall separating a distillery and a taproom must meet which of the following requirements based on a flammable liquid presence?

A.

1-hour fire barrier

B.

2-hour fire wall

C.

1-hour smoke partition

D.

3-hour fire barrier

Before construction documents are complete, the owner requests a review of the timeline allowed for ASIs, RFIs, RFPs, and change orders as defined in the project manual.

Which section of the project manual is relevant to this request?

A.

AIA Document A201

B.

Supplementary Conditions

C.

Section 01 26 00 Contract Modification Procedures

D.

Section 01 35 16 Alteration Project Procedures

Refer to the exhibit.

What is the horizontal member indicated by the arrow in the wall-floor assembly?

A.

Fire block

B.

Girt

C.

Lateral shear plate

D.

Ledger

Refer to the exhibit.

An architect is working on an airport lounge project. The 9,000 SF floor plan includes an open, double-height space. Due to area limitations, all program requirements cannot fit within the 9,000 SF floor plan. A mezzanine level with one exit is being proposed to solve this programming constraint. There are adequate exits available on the main floor plan to pick up the additional occupant load from the mezzanine.

Which method of mezzanine construction should the architect design?

A.

2,500 SF open lounge area for 20 people

B.

2,750 SF enclosed business center for 15 people

C.

3,250 SF open dining area for 30 people

In an air-conditioned space in a tropical environment, roof insulation is being applied above a structural deck. In order to avoid problems related to condensation, where should the vapor barrier be installed?

A.

Above the insulation

B.

Below the insulation

C.

Below the structural deck

D.

Below the ceiling

An architect is designing a sub-surface drainage system that outfalls into a site retention pond. The recommended shape, size, and slope of the drainage lines need to be determined for primarily which of the following purposes?

A.

To minimize the desired flow

B.

To maximize the desired flow

C.

To obtain the desired velocity

D.

To increase the desired velocity

The client requests to limit daylighting in a second-story bedroom located in the northeast corner of a new house, especially in the mornings. The architect is considering options for the windows in terms of quantity, size, type, and location, and notes that emergency escape and rescue openings must provide a minimum clear opening of 5.7 square feet.

A.

Three 2' x 2' awning windows on the east wall

B.

One 4' x 4' fixed window on the north wall

C.

Two 3' x 2' casement windows on the east wall

D.

One 3' x 5' double-hung window on the north wall