Anemergency department's quality improvement report for the first quarter showed the following data:
What was the approximate overall problem rate for March?
The ultimate responsibility for ensuring and maintaining patient safety in a healthcare organization lies with the:
Which tool is used to identify, explore, and display the possible causes of a specific problem or condition?
An organization Is evaluating the data used to measure compliance with medication reconciliation by clinic. Three abstractors have been assigned to collect the data. The compliance data by abstractor and unit are below:
Based on this table, which of the following Is the best next step to evaluate accuracy andreliability ol the data?
A physician, who is not a member of the peer review committee, requests the minutes of the last peer review committee meeting. The healthcare quality professional should respond to this request by:
Which of the following is the best disease management approach to reduce hospitalizations for patients with high blood pressure?
A healthcare quality professional is evaluating a draft quality improvement plan for a new clinical service line. The professional should first focus on:
An organization has Just experienced a wrong site surgery. A quality leader was asked to conduct a review to understand how the process failed. The best quality Improvement tool to use In developing a shared understanding of the current process Is which of the following?
Establishing a culture of safety begins with having the right
A quality professional is leading a rapid process improvement event to reduce central line infections. Which of the following actions should be taken?
A healthcare quality professional receives the following Consumer Assessment of Healthcare Providers and Systems (CAHPS) survey results:
Which of the following should be the next action by the professional?
Which of the following best describes how a quality professional should conduct an organizational assessment to ensure safe transitions of care?
Toassess compliance with quality standards, a healthcare organization needs
The quality improvement team at a hospital is prioritizing projects that could improve both quality of care and reimbursement. Which of the following projects should the team prioritize?
A sentinel event is a situation that reaches the patient and results in either a death, severe or temporary harm, or: