A client subcontracts production work to a vendor for production operations.

You need to model subcontracting of route operations in production orders.

Solution: Ensure that subcontracting of route operations supports back-flush costing.

Does the solution meet the goal?

A.

Yes

B.

No

A company produces multiple products that require an installation kit that includes 50 components.

The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOW kit that includes all SO components, but you do not want it to produce a separate production order.

You need to set up the product BOM for the finished good.

What should you do?

A.

Select Phantom on the engineering fast tab on the kit item.

B.

Change the coverage group on the kit item to Manual.

C.

Change the line type to Pegged supply

D.

Change the line type to Phantom

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution. Determine whether the solution meets the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.

A manufacturing company has a new speaker that is available with standard and premium carbon fiber options.

For the premium option, speakers are made to order. Customers can choose from seven product attributes at different prices.

You need to create and configure the product and pricing for the new speaker.

Solution: Create a constraint-based product with configurations. Use a price model to calculate the different configurable option costs.

Docs the solution meet the goal?

A.

Yes

B.

No

A company plans to use master planning in Dynamics 365 Supply Chain Management. The company will sell items between legal entities.

The company has several facilities across legal entities that can manufacture the same products. Same products are produced only in some plants. To meet product demand, when one facility is over capacity, another facility is used to fulfill the downstream demand.

The organizational entities are:

• LegalEntityA: Plant 1.2, and 3

• LegalEntityB: Plant4and 5

• LegalEntityC: Plant 6. 7, and 8

The following plants must be planned together:

• Plant 1. Plant 3. and Plant 4

• Plant 2. Plant 6. and Plant 8

• Plant 5 and Plant 7

You need to configure master planning for the facilities.

Which configuration mechanism should you use?

A.

Production groups

B.

Item model groups

C.

Coverage groups

D.

Intercompany planning groups

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

A.

Implies[Trim==Legend,Seat==ML]

B.

Seat!=ML

C.

[Trim==Legend|Seat==ML]

D.

Implies[Seat==ML,Trim==Legend]

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Set the operation route type as Standard.

B.

Set the input warehouse on the resource to the vendor warehouse.

C.

Set the operation route type as Vendor.

D.

Set all BOM lines warehouse to the production warehouse.

E.

Set all the BOM lines to resource consumption.

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

You need to configure the options for the new limited-edition bicycle for the summer season. Which configurations should you use? To answer, select the appropriate options in the answer area. NOTE: Each correct selection is worth one point.

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.