You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.

You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.

You have set up the default Start user options for all production orders as shown in the exhibit below.

A discrete manufacturer uses the time and attendance registration for production operations.

All employees register daily clock in and clock out times during a 40-hour. Monday through Friday workweek.

Pay periods are every two weeks. Workers are paid hourly.

The production manager will create work schedules with the following windows:

• Mandatory work hours

• Work hours during which employees can leave early without accruing absences

• Work hours during which employees can work extra time

If a junior production worker works over 90 hours in a pay period. the worker will receive lime and a half over 80 hours. If a senior production worker works over 90 hours in a pay period, the worker will receive double time over 80 hours.

Vou need to configure the system for these requirements.

Where should you configure this functionality? To answer, drag the appropriate forms to the correct requirements. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.

You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.

You need to schedule the order.

Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

A company produces energy-efficient LED lighting solutions. Production is dependent on primary and secondary resources.

The primary resource is skilled assembly workers responsible for assembling LED lighting fixtures. The workers can work on only one fixture at a time during production.

The secondary resource is automated LED soldering machines, which typically operate at a 50% load capacity. The machines can work on multiple LED lighting fixtures at the same time.

The company must optimize the allocation of resources to meet customer demands efficiently.

You need to configure the resources to meet the customer demand.

What should you do?

A.

Navigate to the primary resource and define priority.

B.

Navigate to the primary resource and disable Finite material.

C.

Navigate to the primary resource and enable Exclusive.

D.

Navigate to the primary resource and disable Finite capacity.

You are a manufacturer using Druitt 365 Supply Cham Management

A new series of orders is authorized for production.

You need to identify which documents to use for the released production order.

Which document should you use tor each requirement? to answer drag the appropriate documents to the correct requirements. Each document nay be used once more than once. or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

You need to set up the state control for sales of motorcycles.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

B.

Create an inclusive restricted product list for United States and add the motorcycle part to the list.

C.

Create an exclusive restricted product list for California and add the motorcycle part to the list.

D.

Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Set the operation route type as Standard.

B.

Set the input warehouse on the resource to the vendor warehouse.

C.

Set the operation route type as Vendor.

D.

Set all BOM lines warehouse to the production warehouse.

E.

Set all the BOM lines to resource consumption.

You need to modify the production order defaults for the manufacturing execution production order Start process.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

unmachined plastic pieces

B.

mold tooling

C.

machined plastic pieces

D.

excess plastic