For CLT, which of the following standards is used for the determination of bond line shear test for adhesives?

A.

AITC 113

B.

ANSI 117

C.

ASTM C557

D.

PRG 320

Each of the following is true regarding the fire-resistance rating for exterior bearing walls except:

A.

Type IV-C must be 1 hour

B.

Type IV-A must be 3 hours

C.

Type IV-B must be 2 hours

D.

Type IV-C must be 2 hours

Refer to the figure by clicking on the EXHIBIT button above.

The exterior wall section shown in the Figure provides the prescribed noncombustible protection required by which Construction Type?

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

What fire-resistance rating is required for floors in Type IV-A, IV-B and IV-C construction?

A.

1 hour

B.

2 hours

C.

3 hours

D.

4 hours

Refer to the figure by clicking on the EXHIBIT button above.

The exterior wall section shown in the Figure provides the prescribed noncombustible protection required by which Construction Type?

A.

Type IV-A

B.

Type IV-B

C.

Type IV-C

D.

Type IV-HT

Fire-resistance ratings of members and assemblies can be established by all of the following except:

A.

calculations per IBC Section 722.

B.

fire-resistance testing in accordance with ASTM E84.

C.

fire-resistance designs documented in approved sources.

D.

prescriptive designs of fire-resistance-rated building elements, components or assemblies as prescribed in IBC Section 721.

In Type IV-C construction, a connection between two members of the primary structural frame supporting a floor is required to be protected to achieve a minimum fire-resistance rating of:

A.

1 hour

B.

1-1/2 hours

C.

2 hours

D.

3 hours

The building owner shall be responsible for each of the following for fire safety during construction except:

A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

For a sprinklered Business Occupancy (Group B) in a 15-story building of Type IV-A construction, the maximum allowable building area is:

A.

54,000 sq. ft.

B.

648,000 sq. ft.

C.

972,000 sq. ft.

D.

unlimited.

Materials acceptable for use in fire-protecting connections in Type IV-A construction includes each of the following except:

A.

steel plates.

B.

gypsum board.

C.

a coating approved for the required fire endurance time.

D.

additional wood cover applied over the connection.