When the focus of the specifying and modelling activity is on a solution, the output is referred to as:

A.

design.

B.

requirement.

C.

value.

D.

need.

Which of the following tasks is used to ensure that requirements and designs at different levels are aligned to one another?

A.

Verify requirements

B.

Trace requirements

C.

Gather requirements

D.

Analyze requirements

Which element of a monitoring and evaluation system addresses the data collection procedure?

A.

Indicators.

B.

Reporting.

C.

Metrics.

D.

Structure.

Why would a business analyst (BA) want to define stakeholder assumptions?

A.

To manage risk

B.

To clarify requirements

C.

To assess model completeness

D.

To determine needed organizational changes

What is the purpose of comparing the results collected through elicitation activities?

A.

Validate sufficient information was collected

B.

Confirm that the information is consistent and accurately represented

C.

Ensure that information produced is recorded for later reference use

D.

Classify and organize the results

There is a need to create a scope model for a new software development initiative. Which of the following BEST describes the purpose of a scope model?

A.

To define detailed technical specifications for the software application.

B.

To establish clear boundaries and expectations for inclusions and exclusions from the work.

C.

To document all potential risks and issues that could impact the initiative’s success.

D.

To outline the roles and responsibilities of team members involved in the initiative.

Which of the following is an input to the prepare for elicitation task?

A.

Elicitation activity plan

B.

Set up logistics

C.

Potential value

D.

Needs

" Needs " and " stakeholder engagement approach " are the inputs to which task in the elicitation and collaboration knowledge area?

A.

Elicitation analysis

B.

Prepare for elicitation

C.

Stakeholder collaboration

D.

Conduct elicitation

Which of the following is the integrated output that correctly reflects captured information agreed to by business analysts (BAs) and other stakeholders?

A.

Activity plan

B.

Business analysis information

C.

Concept model

D.

Confirmed elicitation results

The requirements elicitation technique used to iteratively validate the needs of stakeholders that interact with the application is:

A.

interface analysis

B.

observation.

C.

prototyping

D.

reverse engineering.