What tool can be used to help determine whether a specific change strategy will produce promised results?

A.

A GAP analysis

B.

A feasibility study

C.

A customer survey

What does a Cost Plus to a Guaranteed Maximum Price (GMP) contract signify?

A.

The Contractor is selected based on final drawings and his own costs and the individual subcontractors' costs. No cost increases are allowed beyond the GMP.

B.

The Contractor is selected based on GMP price of the final drawings and can charge the project based on all invoices produced plus its Fee & General Conditions costs.

C.

The Contractor is selected early in the project based on its Fee and its General Conditions costs and provides a GMP once drawings are more developed.

During regular preventive maintenance activities, you notice green algae and scaling on the interior walls of the cooling tower. What action should you take to resolve the concerns?

A.

Shutdown the tower, allow surfaces to dry, and scrape biological growth from interior walls before returning the tower to operation.

B.

Test the cooling tower water, adjust the frequency of chemical balancing, and flush if needed.

C.

Perform a building occupant health survey to determine any adverse effects, and then adjust the injection levels of balancing chemicals.

D.

Drain the tower and then complete a fresh-water flush using warm water, and add new balancing chemicals.

Part of your goals is to develop a succession plan for key positions within your operation, including yourself. What is most helpful in reaching this goal?

A.

Conduct staff interviews to see who wants to be promoted.

B.

Conduct a review of staff goals and objectives.

C.

Conduct a skills gap analysis of current staff and incorporate the results into training goals.

What does the effectiveness of infrastructure resilience rely on?

A.

Finance, security, supply chain, communications.

B.

Robustness, resourcefulness, rapid recovery, redundancy.

C.

Back-up power, capital planning, supply chain, security.

D.

Written incident response plans, training, management participation, employee adaptability.

What approach should be taken to accommodate sustainability and customer concerns about installing flow restrictors?

A.

Take no action. The WPM is guided by company sustainability initiatives and this program needs to be implemented.

B.

Offer to place out the flow restrictors in a few designated restrooms to provide customer feedback on their performance. Agree to review and meet later with the WPM.

C.

Install the flow restrictors and remove them without informing the WPM.

D.

Refuse to install the flow restrictors.

You are assigned to manage a janitorial contract for a large facility, and a dispute has arisen over the method and frequency for cleaning the hallways. What is the most expedient strategy for resolving the dispute?

A.

Mediation

B.

Negotiation

C.

Litigation

D.

Arbitration

A company has decided to establish a long-range strategic facility technology plan. What is the first step in determining the future technology needs of the company?

A.

Determine the level of employee technological skill requirements for the future.

B.

Review corporate plans for building renovations and lease negotiations.

C.

Research advances in technology.

D.

Conduct an assessment of existing technology.

When designing an industrial workplace, what is the MOST relevant factor to consider?

A.

Offering electrical and data outlets at desk height

B.

Including both sit-to-stand and seated options

C.

Understanding space dimensions and equipment layout

D.

Providing video monitor and adjustable lighting levels

What is MOST important when creating a facility culture of safety and security?

A.

Relying on a risks and hazards assessment after an incident has occurred

B.

Evaluating potential hazards and implementing corrective action, if needed

C.

Involving only senior management in the risk assessment

D.

Focusing exclusively on near misses