A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability will be monitored as part of the Control Phase to track the sustainability of the improvement.
Which distribution type is best used for performing the Capability Analysis?
When a Belt creates a Process Map she will use a __________________ to depict a decision point requiring a Yes or No decision.
All the data points that represent the total set of information of interest is called the ________________ .
Which statement(s) are incorrect for the Regression Analysis shown here? (Note: There are 2 correct answers).
Using this partial Z Table, how many units from a month’s production run are expected to not satisfy customer requirements for the following process?
Upper specification limit: 7.2 Lower specification limit: 4.3 Mean of the process: 5.9 Standard Deviation: 0.65 Monthly production: 450 units
Each of the items listed would impact the Process Capability for a process with a continuous output except ___________________.
The reported Cpk for a process with an average of 104 units, a spread of 18 units and upper and lower specification limits of 122 and 96 units would be?
What conclusion is most correct about the Experimental Design shown here with the response in the far right column?
If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?
The method of Steepest Ascent guides you toward a target inside the original inference space.