Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

In the preparation phase of RF optimization, which of the following options need to be completed? (multiple choices)

A.

Determine optimization KPI goals

B.

Divide the cluster boundary

C.

Determine the test route

D.

Prepare tools and information

The PCFICH notifies the UE of the number of OFDM symbols occupied by the PDCCH, and it is transmitted in each time slot.

A.

True

B.

False

Which of the following scenarios should use the RIM process? (multiple choice)

A.

Flash CSFB

B.

PS CSFB

C.

CCO/NACC

D.

PS handover

For LTE system messages, which of the following statements are correct? (multiple choice)

A.

Except for SIB1, SIB2-SIB13 are all carried by SI (System Information), and SIB2 must be mapped in the first SI message.

B.

The Scheduling InfoList in SIB2 carries the scheduling information of all SIs. After receiving SIB2, other SI messages can be received.

C.

SIB1 and all SI messages are transmitted on BCCH → DL-SCH → PDSCH.

D.

The transmission of SIB1 is completed through PDCCH scheduling carrying SI-RNTI (SI-RNTI is the same for each cell).

Which of the following events can be used to trigger inter-frequency switching? (multiple choice)

A.

A2

B.

A3

C.

A4

D.

A5

E-UTRAN to GERAN different system switching has five switching strategies: PS HO, CCO/NACC, SRVCC, redirection and fast redirection.

A.

Yes

B.

False

In the LTE system, two inter-frequency measurement GAP modes are defined. Which of the following is the measurement length?

A.

1ms

B.

4ms

C.

6ms

D.

10ms

What are the measurement configuration messages of the E-UTRAN to UTRAN system handover based on coverage? (multiple choice)

A.

Measuring object

B.

UTRAN FDD filter coefficient

C.

Measure GAP configuration

D.

Measuring time

Which of the following control signalings for uplink PUCCH feedback? (multiple choice)

A.

PMI

B.

cQI

C.

RI

D.

Qos

Which signaling is triggered by the statistics of the successful RRC connection establishment?

A.

RRC connection setup

B.

RRC connection request

C.

RRC connection setup complete

D.

RRC connection reconfiguration complete