During routine maintenance of the lithium battery cabinet, which of the following procedure is true about replacing a faulty battery module?

A.

1-6-3-2-5-7-4

B.

1-3-2-6-5-7-4

C.

1-6-2-5-3-7-4

D.

1-2-3-6-5-7-4

On the ECC800-Pro WebUI, the PUE configuration mode can be "Standard" or "User-defined".

A.

True

B.

False

When tightening the screws (M16x50 mm) for the output power cables of lithium battery cabinets, what torque should be used to tighten and verify the screws?

A.

100 N·m

B.

60 N·m

C.

120 N·m

D.

80 N·m

In an in-room solution that adopts overhead air supply through air ducts, the net height of each floor must be greater than or equal to how many meters?

A.

4

B.

6

C.

5

D.

3

The maintenance bypass switch cannot be turned on when the UPS5000-H works in normal mode.

A.

True

B.

False

After installing the FusionCol8000-C (110–440 kW), inject water to preserve the pressure for the chilled water pipes to how many MPa. After 30 minutes, check that no leakage occurs. Preserve the pressure for 24 hours. If the pressure drop is less than 0.01 MPa and no leakage occurs, the pipes do not leak.

A.

0.8

B.

0.5

C.

1

D.

1.2

Which of the following are the user roles of Power Partner?

A.

Service manager of a rep office

B.

Startup engineer

C.

Inventory operations manager

D.

Project manager

E.

DOC

F.

Service engineer

In a data center fire protection design, which approach best matches Huawei facility practice for protecting IT rooms while minimizing secondary damage to IT equipment?

A.

Use only portable extinguishers and rely on manual response

B.

Deploy a smoke detection system plus a clean-agent gas extinguishing system with interlock controls for automatic release

C.

Install a water sprinkler system as the only suppression method inside the IT white space

D.

Disable automatic suppression to avoid accidental discharge

Which of the following interfaces is used to connect the controller and the main control module of the unit?

A.

DP

B.

USB

C.

SW

D.

I2C/12v

If the startup password authentication for a smart module is not complete, the ECC800-Pro WebUI and app cannot be used for commissioning.

A.

True

B.

False