What is the value of cloud infrastructure planning and design for customers? (Multiple choice)

A.

Cloudify computing, storage, and network resources

B.

Implement unified resource management and operations through operations, operations components, and operations

C.

Help users achieve efficient use of IT resources, agile operations, and streamline operations

D.

Multi-data center unified cloud services, unified O&M

E.

Unified access management for multi-resource pooling and heterogeneous virtualization

What components does fusionSphErE Cloud Suite Standard Edition include? (Multiple choice)

A.

FusionSphErE OpEnstACK

B.

FusionComputE

C.

BCM EBACKup Premium

D.

MAnAg EOnE Dual Machine Standard Edition

E.

ESight virtualization components

GSM-R evaluation and optimization service expansion strategy is incorrect:

A.

GSM-R new networks must bundle network premium services

B.

GSM-R Optimization Services and Planning and Design Services are sold in packages and cannot be split

C.

Customers have purchased maintenance services and do not need to purchase online preferential services

D.

GSM-R Centralized Network Optimization and GSM-R Expert Support Optimization Services are expanded by collecting existing network issues and network assessment models

Huawei's online eLad service uses Huawei virtual resources and has no physical equipment, so it can meet the needs of unlimited customers to experiment and learn anytime, anywhere.

A.

True

B.

False

Resource preparation is one of the most important links before the implementation of the data center project, and it also directly determines the quality and progress of the construction. Generally, preparation is made from the following five points of man, machine, material, law and ring.

A.

True

B.

False

The common parameter for evaluating the overall energy efficiency index of the data center is ().

A.

STINKS

B.

HONOR

C.

TCO

D.

BLOW

Data center L1 layer business deepening design goal (multiple choice)

A.

On the basis of the summary audit plan (bidding plan), the needs of the owner are further clarified, and the boQ at the design plan level is refined, and the design depth reaches the construction drawing standard

B.

Improve the design interface interface to ensure that the design of the respective systems of the project is consistent and coordinated with the professional design of architecture, structure, water, electricity, HVAC, decoration and other professions

C.

Provide technical basis for the bidding of installation units (subcontracted construction units), equipment suppliers and project acceptance

D.

Combined with the actual situation of the project, the work responsibility interface of Huawei (including tripartite purchased parts), subcontractors, and customers is determined, and the project purpose SOW (scope of work) and support determination RM (Responsibility)

Huawei's career certification system is based on years of experience in ict talent training and understanding of industry development, based on the ict industry chain talent personal career development cycle, with levels of vocational and technical certification IP, IT, CT and ICT fusion technology certification system; the only ICT all-technology certification system.

A.

True

B.

False

Which of the following documents is not required by the submitter of the representative office training requirements at the stage of submitting the training opening application stage?

A.

Customer Training Registration Form

B.

Customer Training Needs Application Form

C.

Training Proposal or Schedule (Closed Class)

D.

Training outline

Huawei's service migration solution is divided into three main scenarios, which is the error? ()

A.

P2V

B.

Migrate between cloud platforms of other vendors

C.

V2V

D.

Internal migration of HUAWEI CLOUD platform