Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

The main criterion of the data center design reference in the national standard Yes?

A.

GB50174-2008

B.

GB50462-2008

C.

GB50052-2009

D.

GB50352-2005

At present, China does not sell data center L1 operation and maintenance optimization services.

A.

True

B.

False

What are the three typical scenarios of FusionCuBE? (Multiple choice)

A.

Virtual pooling (virtualized appliances).

B.

Database acceleration (all-in-one, HANA all-in-one).

C.

Office cloudification (desktop cloud all-in-one).

D.

Storage resource pooling

According to the nature of use, management requirements and the degree of loss or impact caused by the interruption of the operation of the electronic information system due to the failure of the site equipment, the data center is divided into () levels.

A.

3

B.

4

C.

5

Data Center L1 Integration Service Project Initiation Phase Goal?

A.

Set up a project team

B.

Identify project team members

C.

Pull-through resources are determined to do "total integration"

What is the quotation method of integrated project management?

A.

Standard manual quotation

B.

SCT

C.

Configurator

belongs to the data center L1 integration service interface is.

A.

Land planning

B.

Civil

C.

electric

D.

correspondence

What are the benefits of IP network evaluation optimization services for customers? (Multiple choice)

A.

Increase network availability

B.

Improve network performance

C.

Reduce operational costs

D.

End-to-end ICT planning and design capabilities

Which of the following products comes with warranty service that is not basic maintenance?

A.

Digital pass

B.

transmit

C.

storage

D.

access

Cloud computing data center fast housing exhibition is a strategic opportunity for ITO, this is because: () (multiple choice)

A.

The reconfiguration of the cloud data center operation and maintenance model and the new requirements of the operation and maintenance tools

B.

Asset-light operational requirements and centralized operational risks

C.

Make heavy use of new technologies with data centers

D.

Cloud computing technology teams are hard to come by quickly