Your customer has the following concerns about your dHCI proposal:

The extended lead times for some parts of the solution do not meet their Project timelines.

They do not have sufficient IT resources to deploy a new solution.

They are struggling with the initial cost outlay.

Which solution addresses all three of their concerns?

A.

Use the HPE TCO and ROI calculator to develop a compelling business case that highlights the value proposition as well as essential financial metrics that are important to the customers.

B.

Use the HPE Assessment Foundry to find ways to lower the amount of storage needed. Use the results of the reports to use cheaper drives in the storage array. Also HPE Pointnext services for installation.

C.

Rebuild the solution in OCA, and look for opportunities in the tool to replace long lead time components with similar components that have shorter lead times. Also with your sales team to revise the cost of the solution to meet customer needs.

D.

Rebuild your solution using the HPE GreenLake Quick Quote tool. With HPE GreenLake, the solution can be delivered in as little as 14 days, GreenLake solution deployed by HPE, and the solution is billed monthly.

Your customer is considering a new HPE Alletra 9060 to service their mission critical database workloads.

Their CFO is concerned with the cost of the unused excess storage capacity that will service unforeseen future growth.

What business values does HPE GreenLake for Block Storage provide that could alleviate this concern?

A.

It offers CapEx purchases so the client can depreciate the storage assets.

B.

It sets the minimum capacity commitment level to the required capacity.

C.

It provides storage capacity on an as-needed basis at a predetermined cost per GB.

D.

It provides a fixed monthly cost, regardless of the storage consumption.

You need to include non GreenLake enabled ISVs in a customer solution.

With whom should you engage if you need help with this solution?

A.

HPE Pointnext advisory services

B.

HPE ProLiant product management

C.

HPE Pointnext operational services

D.

HPE Complete product management

You are presenting an HPE GreenLake for Private Cloud Enterprise proposal.

Which of the following statements is true?

A.

It only supports containerized workloads.

B.

It only supports virtualization workloads.

C.

It can support both containerized and virtualization workloads at the same time.

D.

It can support either containerized or virtualization workloads, but not at the same time.

You are presenting an HPE GreenLake for private Cloud Enterprise solution to a CFO.

Which financial key performance indicator (KPI) can you show via GreenLake Central?

A.

ROI

B.

TCO

C.

Net present value

D.

Metered charges

Which protocol should you recommend for a dedicated lossless fabric?

A.

Internet SCSI

B.

Fibre Channel (FCP)

C.

Fibre Channel over Ethernet (FCoE)

D.

Fibre Channel over IP (FCIP)

Your customer needs a single-node 60TB S3 target for some of their applications.

Which solution meets their requirements?

A.

HPE MSA 2062

B.

HPE Alletra 6030

C.

Scality RING

D.

Scality ARTESCA

Which statement about the CloudPhysics report above is correct?

A.

The cluster does not have enough resources for HA to restart all VMs in the event of a host failure.

B.

Networks indicates the number of vSwitches present in the cluster.

C.

There is 27.22TB of storage capacity in the cluster.

D.

There are 3 ESXi hosts in the cluster.

Match the options from left to right.

Which components are part of HPE GreenLake Data Protection. (Choose two.)

A.

Application mobility

B.

Disaster recovery

C.

Azure blob backup

D.

CSI plugin

E.

Object gateway