What indicates the breaking capacity of a fuse or breaker?
When designing a data center network, your company wants to minimize the number of network switches to manage.
What type of physical cabling layout would be the best choice?
The building in which the computer room is housed is required to have a sprinkler system. The building is therefore equipped with a wet pipe system.
What action, if any, should you recommend for the computer room?
In which stage of the data center life cycle does commissioning take place?
The pipes of a VESDA smoke detection system are installed at the air intake of the air conditioner inside the computer room.
Is this a good practice from an early smoke detection point of view?
In order to save energy, you are going to install an automated system to switch off lights. What should be taken into consideration when installing such a system?
You want to make cooling more effective by setting cold aisle temperature to 4 °C (39 °F). Is this acceptable?
A data center requires an audit to find out whether it conforms with ANSI/TIA-942 Rated-3 (concurrently maintainable).
Will the network architecture be part of this audit?
The noise levels in the data center are approximately 91 dB (A).
Do employers need to take precautions?
Maximum exposed area of fire-rated glass is 2 m², but the window is 5 m². What is the best option?