What is a valid 2-node VxRail cluster configuration?

A.

2x 10 GbE and 2x 25 GbE in a switch configuration and external vCenter

B.

2x 1 GbE and 2x 10 GbE in a direct-connect configuration and external vCenter

C.

2x 1 GbE and 2x 10 GbE in a switch configuration and internal vCenter

D.

2x 10 GbE and 2x 25 GbE in a direct-connect configuration and internal vCenter

What Is a supported method for racking nodes for a new VxRail deployment?

A.

In the rack hosting the network equipment used to manage the iDRAC

B.

With PDUs connected to 120v single phase 5-amp electrical circuits

C.

Starting with node 1 at the top of the rack

D.

With server exhaust facing the cold aisle

A VxRail E560F model was delivered six months ago and is now scheduled to be installed with the target code. What is the correct order of steps to complete this task?

A VxRail API request has been executed and the user account does not have vCenter privileges to perform the task What code is returned?

A.

200

B.

207

C.

403

D.

500

What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?

A.

External vCenter server must be upgraded after the VxRail is upgraded

B.

vCenter Server requires a temporary IP address on a different subnet before the upgrade

C.

Secure boot must be enabled on the ESXi hosts for a successful upgrade

D.

VxRail Manager VM must be changed to the default name to avoid an upgrade failure

An implementation engineer is tasked with setting up RecoverPoint for VMs on a new 4-node E Series VxRail duster How many VMs are licensed to be protected on the cluster?

A.

5

B.

10

C.

20

D.

25

An implementation engineer is expanding an existing VxRail E Series cluster with an additional node The version of the node is not at the current cluster level and is not compatible

What action must be performed before adding the node?

A.

Order node with correct image

B.

RASR Factory Reset

C.

RASR Factory Image Upgrade

D.

Compute node expansion

What is a consideration when expanding a VxRail cluster? (Choose two.)

A.

Mixing of All-Flash and all-NVMe nodes in a cluster is not allowed

B.

Expanding a cluster to 64 nodes requires a 25 GbE network

C.

G Series clusters can be expanded only with G Series nodes

D.

1 GbE must be hybrid and single processor node type

What must be used when deploying VxRail with a customer-supplied VDS?

A.

Deployment Wizard using the configuration file method

B.

Deployment Wizard using the step-by-step method

C.

VxRail API with configuration file

D.

VxRail PowerShell SysBringUp Module

From what environment must a network administrator run VxRail network validation?

A.

Windows PowerShell command prompt

B.

Same subnet as VxRail Management Network

C.

Top of Rack switches

D.

VxRail Deployment Wizard