Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

Which two steps must be completed to finish configuring the Management Controller, once the PowerFlex has been deployed? (Select 2)

A.

Enable VMware vSphere HA and DRS.

B.

Configure a File Services node.

C.

Set up a NAS server.

D.

Delete vSwitch0.

E.

Reconfigure MDM roles.

Which four prerequisites must be met before deploying PowerFlex on the Management Controller? (Select 4)

A.

Set up hardware affinity.

B.

Deploy VMware vCenter.

C.

Install and configure ESXi on the Management Controller.

D.

Deploy and configure the storage VMs.

E.

Configure the switch ports.

F.

Configure VM HA and DRS.

Which three networks are configured during the PowerFlex implementation process? (Select 3)

A.

flex-node-mgmt

B.

pfmc-sdc-mgmt

C.

pfmc-sds-mgmt

D.

pfmc-vmotion

E.

flex-node-data