Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

A platform engineer cables, powers up, and creates a new cluster of F600 nodes. While performing verification checks, no clients can access the cluster and the engineer cannot ping the nodes.

What is the probable issue?

A.

Manual reboot was not done following the cluster join.

B.

Network was connected to the F600 rNDC ports.

C.

Nodes were connected to the management ports.

D.

Internal network was cabled improperly.

After finishing the installation of a Dell EMC PowerScale Gen 6 cluster, a customer asks the platform engineer to demonstrate the proper way to remove and replace the front node bezel. They remove the bezel successfully.

What is the correct way to replace the bezel?

A.

Make sure all the front-loaded hard drives have no red LEDs, then replace the bezel and secure it with the thumb screws.

B.

Center the bezel faceplate on the node chassis and press the left side, then the right side, until the bezel clicks.

C.

Push on the bezel ends and press the bezel until it latches.

D.

Align the bezel ends with the clips and press the bezel center.

Dell EMC Technical Support has requested a part to be sent directly back to Dell Logistics to be studied. Which process or document needs to be completed prior to sending the part back?

A.

WWF

B.

CDMR

C.

DMR

D.

WWFA

A platform engineer is creating a Dell PowerScale cluster that must meet SEC 17a-4f rules. Node 1 is powered on and cabled.

What action must be taken to meet the requirement?

A.

Create a cluster.

B.

Reboot into SmartLock Compliance mode.

C.

Activate the Enterprise Security mode license.

D.

Call Dell Tech Support to configure the cluster manually.

A Dell EMC PowerScale platform engineer is asked to reimage a node.

What should they check before they start the reimage process?

A.

The treedelete job has been run against the node.

B.

Customer has redundant paths to their data.

C.

Node has been SmartFailed and removed from the cluster.

D.

SyncIQ job has been run to copy the node data.

A platform engineer is connecting a new Dell PowerScale F600 node to the frontend switch in an existing cluster with legacy nodes.

How should the network cables be connected?

A.

From the PCIe slot 1 to the frontend Ethernet switch

B.

From the PCIe slot 3 to the frontend Ethernet switch

C.

From the PCIe slot 1 to the frontend InfiniBand switch

D.

From the PCIe slot 3 to the frontend InfiniBand switch

The SSD has failed in a Dell EMC PowerScale H400 node that has one SSD installed. A technician is asked to replace it.

Where should the new drive be installed?

A.

Left slot at the back of the node

B.

Position 0 and sled A

C.

Position 0 and sled E

D.

Right slot at the back of the node

An engineer wants to create a 4-node cluster after rack and stack.

What port must they use to start the installation?

A.

COM

B.

FE

C.

BE

D.

iDRAC

An engineer runs ini_reformat_node command.

What are they attempting to do?

A.

Reformat the mirrored FEC data.

B.

Reformat a node quickly to repurpose a node.

C.

Reformat the mirrored journals.

D.

Reformat a node to securely erase all data.

What is the purpose of SolVe Desktop?

A.

Gather logs from the cluster for analysis

B.

Perform pre-upgrade checks on the cluster

C.

Provide centralized access to step-by-step procedures

D.

Provide access to the latest OneFS codes and firmware upgrades