A platform engineer cables, powers up, and creates a new cluster of F600 nodes. While performing verification checks, no clients can access the cluster and the engineer cannot ping the nodes.
What is the probable issue?
After finishing the installation of a Dell EMC PowerScale Gen 6 cluster, a customer asks the platform engineer to demonstrate the proper way to remove and replace the front node bezel. They remove the bezel successfully.
What is the correct way to replace the bezel?
Dell EMC Technical Support has requested a part to be sent directly back to Dell Logistics to be studied. Which process or document needs to be completed prior to sending the part back?
A platform engineer is creating a Dell PowerScale cluster that must meet SEC 17a-4f rules. Node 1 is powered on and cabled.
What action must be taken to meet the requirement?
A Dell EMC PowerScale platform engineer is asked to reimage a node.
What should they check before they start the reimage process?
A platform engineer is connecting a new Dell PowerScale F600 node to the frontend switch in an existing cluster with legacy nodes.
How should the network cables be connected?
The SSD has failed in a Dell EMC PowerScale H400 node that has one SSD installed. A technician is asked to replace it.
Where should the new drive be installed?
An engineer wants to create a 4-node cluster after rack and stack.
What port must they use to start the installation?
An engineer runs ini_reformat_node command.
What are they attempting to do?
What is the purpose of SolVe Desktop?