Which of the following terms defines the assessment of the risk factors and the relationship that exists between these factors?
To comply with a certain information security risk management standard, George did an exercise to identify all the risks that his organization faced. He ascertained that his organization was vulnerable to the following risks: phishing emails to the employees of his organization, earthquakes (common for the city in which his office was located), destruction of the organization’s critical data due to the crashing of the primary server, and electrical surges, which in the long term could cause harm to the primary server.The standard demanded that he prioritize these risks before chalking out a plan to deal with them and identify the risk with the highest priority. According to George, electrical surges were the highest priority risk. Which standard is George trying to comply with?
To protect against a disaster or other site-specific problem, many people choose this method to back up their media. The location can be as simple as the system administrator’s home office or as sophisticated as a disaster-hardened, temperature-controlled, high-security bunker that has facilities for backup media storage. Which type of backup method is being referred to here?
Rachel was reviewing the various tiers of disaster recovery so as to implement them in her startup. One particular tier attracted her attention, and she wanted to put it into effect in her startup. This specific disaster recovery tier backed up data over a WAN connection. Which disaster recovery tier did Rachel want to implement in her startup?
XYZ Inc. is an esteemed organization that deals with a variety of internet services and solutions. The organization is developing an Internet-based messaging application, which is currently in the analysis phase. According to the analysis conducted, if a disaster destroyed the primary server, the secondary server would only be able to take the traffic load for four hours since it had limited memory and storage capabilities. Hence, the primary server would need to be up and running within four hours. What technical term best defines this time period of four hours?