Cementitious materials are ________ based materials.

A.

Dry powder

B.

Latex

C.

Solvent

D.

Sand

You are designing the cabling infrastructure for a lab office building that will frequently change tenants. The owner will be responsible for all of the infrastructure that feeds each floor to include the telecommunication rooms. Which firestop method will best suit the owners needs?

A.

Cable transit system

B.

Factory fabricated sleeve system

C.

Firestop pillow system

D.

Silicone foam system

Firestop ________, in conjunction with steel wedging plates, go in a steel cable tray.

A.

Bag

B.

Block

C.

Intumescent sheet

D.

Silicone foams

You are designing a firestop system for a boiler room that will have conduits coming from the service provider maintenance hole into the building. Which test rating will address the firestops ability to resist breakdown from water damage?

A.

F rating

B.

L rating

C.

T rating

D.

W rating

Which of the following is a nonmechanical firestop system?

A.

Cable transit system

B.

Firestop blocks

C.

Fire rated pathway device

D.

Factory fabricated sleeve system

The MINIMUM finished height of access flooring in a general office area is:

A.

50 mm (2 in)

B.

150 mm (6 in)

C.

200 mm (8 in)

D.

250 mm (10 in)

E.

300 mm (12 in)

In the ceiling zone method of distribution, the usable floor area should be divided into zones each measuring:

A.

9.3 sq m (100 sq ft) to 23 sq m (250 sq ft)

B.

23 sq m (250 sq ft) to 56 sq m (600 sq ft)

C.

23 sq m (250 sq ft) to 84 sq m (904 sq ft)

D.

56 sq m (600 sq ft) to 84 sq m (904 sq ft)

E.

56 sq m (600 sq ft) to 100 sq m (1,100 sq ft)

Using the "pathway design" for horizontal cable distribution, how many cable runs are placed to serve 15 individual?

A.

15

B.

30

C.

45

D.

60

An existing ceiling raceway system has 115,000 sq mm (177 sq in) of cross-sectional area available for distribution of cable runs. How many can be served by the existing system?

A.

115

B.

160

C.

177

D.

189

E.

195

Cables are installed in a ceiling in a straight line. The ceiling run is 60 m (200 ft) in length. What is the MINIMUM number of J-hooks required to support the cables?

A.

20

B.

30

C.

40

D.

50

E.

60