Which of the following best defines “project scope”?

A.

The cost estimate for the project

B.

The detailed description of work to be performed and deliverables

C.

The installation schedule

D.

The brand of equipment used

Which tool is used to create detailed system wiring diagrams?

A.

CAD software

B.

Word processor

C.

Spreadsheet

D.

Presentation software

Which of the following best describes “scalability” in AV system design?

A.

System’s ability to be expanded or upgraded easily

B.

Initial installation cost

C.

Cable type used

D.

Signal strength

When designing an AV system, which cable type is best suited for long-distance video transmission with minimal signal loss?

A.

HDMI

B.

Cat5e Ethernet

C.

Fiber optic

D.

RCA

Which document usually contains the budget and schedule constraints for an AV project?

A.

Project charter

B.

Project management plan

C.

Statement of work

D.

Risk management plan