When a team is defining a software metrics program, which of the following steps must be taken first?
A software quality engineer (SQE > is testing software in a system used to monitor critically ill patients and administer dosages of life-sustaining medicines Tests reveal a flaw that could result in an unscheduled shutdown under certain circumstances. Ox er the SQE's verbal and written objections: the director of engineering decides to ship the system. The SQE knows from experience that "whistle-blowers" in the company have lost their jobs The most appropriate next step for the SQE would be to
Which of the following levels of control should be assigned when a software failure may result directly in a mishaps
The tester should complete which of the following sections of a problem report when documenting a test failure?
The best way to reduce post-release defect density in future releases is to
Which of the following types of audits is most often based on customer requirements?
Which of the following describes when a test plan should be changed?
A company uses a feature rating system with the following values.
1= Completely dissatisfied
2= Somewhat dissatisfied
3= Neither satisfied nor dissatisfied
4= Somewhat satisfied
5= Completely satisfied
This rating system is based on what type of measurement scale?
What type of technology- is designed to provide organizational partners with real-time access to information on a business-to-business architecture?
Which of the following is a responsibility of a lead auditor?