When a team is defining a software metrics program, which of the following steps must be taken first?

A.

Determine what data to collect.

B.

Collect preliminary data

C.

Establish the data collection goal.

D.

Select the metrics to report

A software quality engineer (SQE > is testing software in a system used to monitor critically ill patients and administer dosages of life-sustaining medicines Tests reveal a flaw that could result in an unscheduled shutdown under certain circumstances. Ox er the SQE's verbal and written objections: the director of engineering decides to ship the system. The SQE knows from experience that "whistle-blowers" in the company have lost their jobs The most appropriate next step for the SQE would be to

A.

gam support from workers

B.

inform the customer

C.

discuss with top management

D.

remain silent

Which of the following levels of control should be assigned when a software failure may result directly in a mishaps

A.

LOC I - Autonomous Time Critical

B.

LOC Ila - Autonomous Not Tune Critical

C.

LOC nib - Operator Controlled

D.

LOC IV - Not Safety Software

The tester should complete which of the following sections of a problem report when documenting a test failure?

A.

Steps to reproduce the failure

B.

Steps to recover from the failure

C.

Root cause of the problem

D.

Problem resolution description

The best way to reduce post-release defect density in future releases is to

A.

provide online help for known defects

B.

categorize defects and perform analyses to uncover their causes

C.

evaluate defect arrival rates and analyze defect resolution costs

D.

maintain a responsive helpdesk function to identify recurring problems

Which of the following types of audits is most often based on customer requirements?

A.

Process

B.

Product

C.

System

D.

Quality

Which of the following describes when a test plan should be changed?

A.

After product stability has been assessed

B.

After changes to the design specifications

C.

After each code review

D.

When the configuration management tool is updated

A company uses a feature rating system with the following values.

1= Completely dissatisfied

2= Somewhat dissatisfied

3= Neither satisfied nor dissatisfied

4= Somewhat satisfied

5= Completely satisfied

This rating system is based on what type of measurement scale?

A.

Nominal

B.

Ordinal

C.

Interval

D.

Ratio

What type of technology- is designed to provide organizational partners with real-time access to information on a business-to-business architecture?

A.

Embedded system

B.

Encrypted email

C.

Extranet

D.

Internet

Which of the following is a responsibility of a lead auditor?

A.

Submitting the audit report

B.

Determining the scope of the audit

C.

Determining the corrective actions required

D.

Performing the initial review of the quality system