Which of the following corrective actions is the first action to take when a project experiences a significant deviation on baselined budgets, baselined schedules, or required quality levels?

A.

Add resources and continue with the plan.

B.

Cancel the project because of the deviation.

C.

Create a new baseline and continue with the plan.

D.

Realign project actuals and continue with the plan.

Which of the following software development methodologies uses test cases as an aspect of requirements and design to implement code?

A.

Waterfall

B.

Incremental

C.

Scrum

D.

Extreme Programming (XP)

Which of the following factors is important in a software product m terms of its adaptability?

A.

Efficiency

B.

Accessibility

C.

Trainability

D.

Portability

When modifications are made to a software system, which of the following tools is helpful for determining appropriate verification and validation tasks?

A.

Affinity diagram

B.

Pareto chart

C.

Cause and effect diagram

D.

Requirements traceability matrix

Quality function deployment is defined as a

A.

procedure in which code modules with low defect density are identified for reuse

B.

technique for measuring complex metrics by random sampling of functional units

C.

method that provides a framework for relating product features to customer needs

D.

process in which best practices are distributed throughout all levels of an organization

Which of the following statements is true about open source software (OSS)?

A.

There is no risk involved when testing OSS.

B.

Modifications to OSS do not need to be tested.

C.

OSS can always be modified without significant repercussions.

D.

OSS can be problematic when it comes to keeping up with changes.

The executive summary of a project management report should emphasize details related to

A.

completed tasks

B.

testing deliverables

C.

risks to the project

D.

stage phase containment status

The following chart was created by a team.

The chart shows number of defects over time, including projected unit test defects, projected integration test defects, actual unit test defects, and actual integration test defects. Which of the following conclusions can be drawn from this chart?

A.

Unit testing has been poorly planned.

B.

Unit testing is isolating as many defects as predicted.

C.

Integration testing is very effective in isolating defects.

D.

Integration testing is isolating as many defects as predicted.

A software hazard analysis should be conducted in order to

A.

identify and evaluate the level of risk

B.

predict when the hazard will occur

C.

calculate the cost of correcting the problem

D.

comply with government regulations

A use case is described as a technique that illustrates the

A.

internal view of the system

B.

design of the software

C.

functionality of the system

D.

steps taken by the developer