Defect prevention should be initiated during the

A.

test phase

B.

requirements phase

C.

design phase

D.

coding phase

A project team conducts a review of its latest software design The review process is well-defined and is used by all projects within the company. As part of the review process, defect levels are compared against acceptable limits to determine appropriate corrective action. According to the CMMI-DEV Vl_2_. which of the following activities could the company perform to demonstrate characteristics unique to a Maturin' Level 5 organization?

A.

Submit defect data to a team for future defect prevention.

B.

Collect defect data for each project's specific software process.

C.

Record defect data and establish the process capability baseline

D.

Assess the validity of each defect data measurement independently.

Which of the following metrics would be most appropriate for evaluating how effective the peer review process was for removing defects?

A.

Cycle time

B.

Defect density

C.

First-pass yield

D.

Requirements volatility

Under design control, the design phase should proceed until

A.

system elements of the smallest structure are defined and specified

B.

the developers understand the level of work expected

C.

the allocated time for system design has been reached

D.

every possible design variation has been explored

Which of the following corrective actions is the first action to take when a project experiences a significant deviation on baselined budgets, baselined schedules, or required quality levels?

A.

Add resources and continue with the plan.

B.

Cancel the project because of the deviation.

C.

Create a new baseline and continue with the plan.

D.

Realign project actuals and continue with the plan.

Which of the following sets of reviews is considered an example of a project phase gate review?

A.

Management and retrospective reviews

B.

Management and ready to ship reviews

C.

Architectural design and retrospective reviews

D.

Architectural design and ready to ship reviews

What type of audit is designed specifically to provide assurance that activities have been performed as documented?

A.

Compliance

B.

Supplier

C.

Quality

D.

Operations

Which of the following actions is designed to prevent future defects?

A.

Using white-box testing

B.

Applying reverse-engineering to a defective system

C.

Conducting a causal analysis

D.

Injecting defects to test a system

Software configuration status accounting is the process of

A.

partitioning the software product into formally identified configuration items

B.

systematically controlling changes to software items under configuration control

C.

recording and reporting of information needed to effectively manage a software configuration

D.

providing objective assurance that the software configuration items being built match their requirements

Software security is developed to address which of the following types of communication threats?

A.

Intentional attacks

B.

Unintentional attacks

C.

Physical attacks

D.

Natural disasters