Which of the following activities can be performed during the requirements phase?

A.

Data normalization

B.

Acceptance test planning

C.

Functional testing

D.

Reliability modeling

What type of audit is performed to verify that the components of a system match the documented deliverables?

A.

Second-party

B.

Third-party

C.

Physical configuration

D.

Functional configuration

Which of the following outputs is most likely to result from a sprint retrospective?

A.

Stakeholder feedback

B.

Refined product backlog

C.

Product enhancement request

D.

Continuous improvement action

After test procedures have been executed and problems have been identified, the next step should be to

A.

begin updating the test cases and perform a retest

B.

release the product to the customer

C.

implement appropriate changes to the code

D.

develop plans to resolve the issues reported

Which of the following tools should be used to identify the steps in the development process that are the source of the most software defects?

A.

Run chart

B.

Pareto chart

C.

Scatter diagram

D.

Control chart

The modules in the following table were all created two years ago as part of the same software project

Current Cyclomatic

Module Version Complexity

A 12 9

B 3 21

C 9 4

D 11 20

Which module is the most likely candidate for reengineering?

A.

Option a

B.

Option b

C.

Option c

D.

Option d

The software configuration management (SCM) planning process includes

A.

identifying; analyzing; and mitigating SCM risks

B.

establishing and documenting SCM policies for the organization

C.

monitoring the performance and effectiveness of SCM processes

D.

defining the specific SCM roles and responsibilities for the project

One advantage of using the pair programming development methodology is that

A.

fewer defects are introduced into the code

B.

fewer unplanned features are identified

C.

more collaboration occurs with the customer

D.

more work is devoted to completing the documentation

Which of the following elements must be in place for a measure to be reliable?

A.

A well-designed data collection form

B.

An automated tool for calculating the measure

C.

An operational definition of the measure

D.

An online database for tracking the measure

The following graph depicts errors per 1,000 lines of code (KLOC) for modules S, T, U, and V.

The program manager should be most concerned about which module?

A.

S

B.

T

C.

U

D.

V