Defect prevention should be initiated during the
A project team conducts a review of its latest software design The review process is well-defined and is used by all projects within the company. As part of the review process, defect levels are compared against acceptable limits to determine appropriate corrective action. According to the CMMI-DEV Vl_2_. which of the following activities could the company perform to demonstrate characteristics unique to a Maturin' Level 5 organization?
Which of the following metrics would be most appropriate for evaluating how effective the peer review process was for removing defects?
Under design control, the design phase should proceed until
Which of the following corrective actions is the first action to take when a project experiences a significant deviation on baselined budgets, baselined schedules, or required quality levels?
Which of the following sets of reviews is considered an example of a project phase gate review?
What type of audit is designed specifically to provide assurance that activities have been performed as documented?
Which of the following actions is designed to prevent future defects?
Software configuration status accounting is the process of
Software security is developed to address which of the following types of communication threats?