Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

Several units from a random sample of units produced on Line 3 were found to be defective. Which of the following actions should be taken next?

A.

Segregate the defective units

B.

Measure all units produced on the line

C.

Ask someone to disposition the defective units

D.

Measure the units again to confirm they are defective

The following diagram was developed from a designed experiment.

Which of the following statements is true about the factors in this experiment?

A.

They are confounded.

B.

They are replicated.

C.

They show randomization.

D.

They show interaction.

If the mean time between failures (MTBF) for a device is 200 hours, what is the constant failure rate per hour?

A.

0.005

B.

0.002

C.

0.500

D.

0.200

Which of the following criteria must be considered when a classification of defects system is established?

A.

The current cost of quality system

B.

The financial impact of the defects

C.

Tightness of tolerance as an indication of failure

D.

The relative seriousness of the defects

Which of the following test methods is considered destructive?

A.

Radiography-

B.

Acoustic emission

C.

Corrosion

D.

Magnetic particle

A company is designing a production process for a new consumer product. To ensure that the product will be traceable from design and production through end-user receipt and use. the company must develop a system for product

A.

review

B.

packaging

C.

identification

D.

storage

Which of the following elements describes the combination of the severity and probability of occurrence of harm?

A.

Failure mode

B.

Hazard

C.

Risk

D.

Detection

A process produces rejects at a rate of 6° o. If multiple samples of 5 are drawn from a population of 100.000. what is the expected number of rejects per sample?

A.

0.3

B.

30.0

C.

5,000.0

D.

6,000.0

Corrective action requests are primarily

A.

Issued to correct supplier deficiencies.

B.

Generated to correct auditing deficiencies.

C.

Formal requests for corrective and preventive action.

D.

A result of nonconformances detected in the internal inspection process.

The following drawing is for a machined part.

What does the symbol

represent?

A.

Maximum material condition

B.

Gaging target position

C.

Positional tolerance target

D.

Datum target point