Which of the following activities takes place during prototype production and testing?
Which of the following project characteristics would suggest using the PERT technique, rather than the critical path method?
A company has successfully completed improvement projects in several business units. Which of the following breakthroughs would be achieved when the improvements are embedded into the entire organization?
Mixed-model scheduling results in which of the following benefits:
Based on the data provided, assume that time available per day is 840 minutes. What is the takt time per unit of demand?
{exhibit 4027}
The utilization of a downstream nonbottleneck resource is determined by:
Production activity control is essential to a closed-loop system because it:
A company produces a part with a nominal diameter of 2.0 inches and a tolerance of ± 0.006 with a standard deviation of 0.001 inches. A sample has the average diameter of 1.996 inches with a standard deviation of 0.001 inches. What is the CPK and process capability?
The best way to determine feasibility of the capacity plan for a work center is to use:
A company has implemented a corrective action to one of four production lines. Before implementing the change to the other lines, which of the following actions should be taken?