Test results received from cast sample mock-ups will serve to qualify the:

What temperature is required to form a permanent bond in phosphate-bonded plastic refractory?
The maximum angle permitted for gunning below the horizontal is:
The term "shelf life" refers to the maximum time:
Which of the following is the term for aggregate and/or cement that bounces away from a surface against which refractory is being projected by gunning?
Hydration is the process that causes refractory concrete to:
What characteristic shall be required for form selection?
Materials that are easily reduced to a granular or powdery condition after placement are known as:
For as-installed testing in casting applications, what is the minimum number of cast samples required by each mixing crew per material per shift?
Refractory abrasion is defined as the wearing away of the surface by: