How is root cause analysis defined?

A.

Determines who is at fault

B.

Determines the prime causes of a failure

C.

Identifies cause of low reliability

Which of the following ranges of ratios is generally accepted to be a reasonable ratio of maintenance technicians to dedicated maintenance planners?

A.

10:1 to 15:1

B.

20:1 to 25:1

C.

15:1 to 20:1

Which of the following is regarded as the best method for the identification of the most significant maintenance issues?

A.

Root Cause analysis

B.

Pareto analysis

C.

Bottleneck analysis

Why is management of change important?

A.

Because it is important an organization changes with the times to control cost

B.

Because bringing change can introduce new risks to an organization’s objectives

C.

Because change programs often involve a large proportion of the workforce

Which of the following is the basis for the decisions of a criticality analysis?

A.

Reward

B.

Risk

C.

AIM

Which of the following drives the maintenance strategy known as run to failure?

A.

Economical efficiency

B.

Production efficiency

C.

Mechanical efficiency

Which of the following would an organization typically consider when setting goals for reliability?

A.

Exceed competitor performance

B.

Align to organizational AIM

C.

Achieving departmental goals

Why is risk management included in asset management?

A.

Asset management requires risks to be kept to a minimum

B.

Risk management often enables cost cutting in the near term

C.

If risks are not treated, there can be unplanned consequences

Why is risk management important to asset management?

A.

Eliminate negative consequences

B.

Risk management informs asset management decision making

C.

Assures value delivery

Which of the following is a generally accepted outcome for maintenance technicians after the implementation of an operator-driven reliability program?

A.

They are scheduled for lower-level tasks

B.

They are scheduled for supervisory tasks

C.

They are scheduled for higher-level tasks