Project schedules help control all of the following EXCEPT for_____________________.
If drafting of the product manual overruns its planned duration by 5 days, how many days may the manufacturing be delayed without affecting release of the product?

If a detailed estimate is NOT available to assist in the formulation of activity durations but unit quantities have been identified, what information can be utilized to estimate work package/activity durations?
What is the free float for Activity F?

How many workdays occur from the start of the Product Testing to the Product Available milestone?
Using the normal schedule, what is the early finish date and total float of Activity 10002?
: 20
Constraints control events or activities that __________________.
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?

Assuming conventional finish-to-start relationships, to calculate a schedule retaining the existing logic means that
When resource leveling craft labor for a critical path schedule, the scheduler