Which of the following metrics could be used to monitor progress along with test preparation and execution? [K1]

A.

The total number of tests planned

B.

The total number of requirements to be tested

C.

The failure rate in testing already completed

D.

The number of testers used for test execution so far

Before an invoice can be created, an account is required. Before an account can be set up, an account user is required (in order to set up the account). The software is delivered with a master user only, who can only create other types of users. The following test cases have been written to test the high-level structure of the software

a. Create an invoice

b. Amend an invoice

c. Process an invoice (send to customer)

d. Delete an invoice

e. Create an account

f. Create an account user

g. Amend an account user

h. Delete an account user

i. Amend an account

j. Delete an account

Which of the following test procedures would enable all tests to be run? [K3]

A.

f, g, a, c, b, d, e, i, j, h

B.

e, i, a, c, b, d, f, g, h, j

C.

e, i, f, g, a, c, b, d, h, j

D.

f, g, e, i, a, b, c, d, j, h

Typically, exit criteria may consist of:

A.

Defining the amount, level of detail structure, and templates for the test documentation.

B.

Estimates of defect density or reliability measures.

C.

Adequacy of the test approaches taken.

D.

Discussions on disaster recovery.

What factors should be considered to determine whether enough testing has been performed?

(i)The exit criteria.

(ii)The budget.

(iii)How big the test team is.

(iv)The product's risk profile.

(v)How good the testing tools are.

(vi)Sufficient details of the system status to allow decisions

A.

i and ii and iv and vi

B.

i and ii and iii and vi

C.

ii and iii and iv and v

D.

i and ii and v and vi

What other details should be included in the following incident report when it is first submitted?

Date of Issue: 23/11/05

Severity: P1

Build: Version15.6

Details: Expected field to be limited to 15 chars, able to enter 27

A.

Suggested solution, priority and number of defects assigned to this developer.

B.

Status of the incident, degree of impact, Test Case Number.

C.

History, related defects and expected fix time.

D.

Line of code, number of defects found, time of day.

Which of the following is a consideration when deploying test execution tools? [K1]

A.

Data-driven testing cannot be used with test execution tools

B.

Recorded manual tests may become unstable in use

C.

Keyword-driven testing cannot be used with test execution tools

D.

Expected results for tests are not required because the tool generates expected results

Which statement correctly describes debugging? [K2]

A.

Testers identify defects, developers locate and correct defects, testers confirm the correction has cleared the original defect

B.

Developers identify defects, testers locate defects, developers correct and confirm the correction has cleared the original defect

C.

Testers identify and locate defects, developers correct defects and confirm the correction has cleared the original defect

D.

Developers identify, locate and correct defects, testers confirm the correction

has cleared the original defect

Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? [K2]

a. Regression tests run and passed in systems testing

b. Incidents closed in systems testing

c. Planned tests run and passed in system testing

d. Planned tests run and passed at all levels of testing

e. Incidents raised and closed at all levels of testing

A.

a and e

B.

b and c

C.

d and e

D.

a and b

A client-server system for a web development must support a minimum of 200 enquiries per hour. In peak times, it must be available 24 hours x 7 days due to the critical nature of the application, and must have a response time lower than 20 seconds during peak loads.

Which of the following set of test types would be most appropriate to verify the non-functional requirements expressed in this statement?

A.

Performance, Usability, Regression.

B.

System, Load, Fail-over.

C.

Performance, Load, Stress.

D.

Load, Volume and Component.

Which of the main activities of the fundamental test process does the task ‘verify the test environment set up is correct’ relate to? [K1]

A.

Planning and control

B.

Analysis and design

C.

Implementation and execution

D.

Evaluating exit criteria and reporting