A design for a WELL building has an entryway system composed of grilles that measure the width of the entrance and 10 ft. (3 m) long in the primary direction of travel. This design can meet healthy entryways by
A permanently installed an conditioner was used during construction What should be done to this equipment prior to occupancy?
A project team wants to provide compliant cycling infrastructure for its occupants to fulfill a WELL feature. Which of the following should the team implement?
A project satisfies requirements lot Feature V10: Self-Monitoring Part 1 if it provides eligible employees with self-monitoring tools mat are subsidized by at least
In Feature S01: Sound Mapping, Part 1: Label Acoustic Zones, which of the following zones needs to be labelled in the annotated document submission?
A project registered under WELL Core Certification has a total area of 100.000 ft3 (9 290 m2). What is the minimum of the total building floor area that should be available tor performance testing?
A)
B)
C)
D)
An office building is at the design stage. The client has the goal of achieving acceptable thermal environment for building occupants. Which of the following strategies should the WELL AP suggest to address this goal and meet the requirements of a WELL feature?
Based on the WELL Building Standard™, what is a possible contributing factor to Type 2 diabetes?
A project administrator is preparing documentation for a project's submittal. In addition to the Letters of Assurance, what other documents must the project administrator submit to support the features being pursued?
A project successfully received both LEED® and BREEAM® certification. The project's WELL Certification is managed by two WELL APs. How many additional points would the project need to achieve the full score under Innovation?