The WELL project administrator realizes that a project's special circumstances do not meet the WELL features, as written. They would like to explore other means of compliance and cannot find a similar situation in the official International WELL Building Institute™ (IWBI™) guidelines. What should the project administrator do next?

A.

Contact the WELL Reviewer

B.

Submit an Equivalency Proposal

C.

Communicate with the project architect

D.

Submit an alternative adherence path (AAP)

To support meal preparation for occupants in an office building, which of the following strategies should the design team include for employees to meet Feature N10: Food Preparation?

A.

Demonstration kitchen

B.

Dining tables and chairs

C.

Sufficient gardening space

D.

Dedicated cabinets or storage units

The facilities management team of a project has ordered a cleaning product that can harm occupants' health. A review of the documentation shows that the team members were unaware of the cleaning plan at the time of the purchase. What is the most likely cause of the misunderstanding?

A.

Facilities management's goals were not discussed at the initial meeting

B.

Communication between project team and facilities management team was collaborative

C.

Project team expected the facilities management team had a clear understanding of the health and well-being goals

D.

Project goals for health and well-being were overlooked during the initial discussion with the facilities management team

A new building project is to be located near a very busy road. Which of the following strategies should the WELL AP recommend at an early stage to minimize acoustic disturbance?

A.

Noise levels from mechanical systems should be higher than external noise breaking in from outside

B.

There should be careful detailing of internal partition junctions where noise flanking between spaces can be an issue

C.

Personal headphones should be made available to all staff during peak hours of the day when the road traffic noise outside is at its highest

D.

Noise sensitive rooms should be located in the middle of the floor plate or along a facade that is physically shielded from external noise sources

Which type of artificial light can improve people's perception of a space?

A.

Electric lights that display signs of flicker

B.

Electric lights with low color rendering index (CRI)

C.

Electric lights with high color rendering index (CRI)

D.

Electric lights that have a temperature lower than 2,700K

To achieve Feature C04: Occupant Survey, Part 2: Administer Survey and Report Results, an occupant survey is required to be administered how often?

A.

Monthly

B.

Quarterly

C.

Semi-annually

D.

Annually

Which of the following are short-term effects of poor indoor air quality?

A.

Headaches, dry throat, eye irritation and runny nose

B.

Respiratory infections, coronary heart disease and stroke

C.

Asthma attacks, lung cancer and sudden infant death syndrome

D.

Depression, dementia, metabolic disorders and high blood pressure

Which of the following describes the purpose of an alternative adherence path (AAP)?

A.

To provide a different solution to meet a feature intent

B.

To enable substitution of a precondition for an optimisation

C.

To apply for a change of points threshold for a certification level

D.

To increase the maximum allowable points available for a given feature

A new retail pharmacy is designing a healthy entryway to achieve Pollution Infiltration Management. The entryway, which is 10 ft. (3 m) long and the width of the entrance, consists of a grating system and rollout mats to effectively reduce the transmission of pollutants. The entryway is vacuumed once a week by the facilities team. How should this healthy entryway be changed to meet the requirements of the standards?

A.

Remove the rollout mats

B.

Remove the grating system

C.

Increase vacuuming to once a day

D.

Increase the length to at least 15 ft. (4.5 m)

In an office building where all of the occupants are under the age of 65 years, which of the following illuminance levels meets the requirements for the office area?

A.

10 fc (110 lux) at floor level

B.

10 fc (110 lux) at task surface

C.

30 fc (320 lux) at floor level

D.

30 fc (320 lux) at task surface