Summer Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: exc65

While creating a scenario for datacenter migration, the administrator decides to change the subscription options from one-year plan to Pay-As-You-Go. The administrator would like to complete this task without running a new scenario.

How should this be accomplished?

A.

Change Cloud Provider

B.

Edit Configuration

C.

Edit Discount

D.

Change Plan

Which three node types make up the vRealize Operations Cluster? (Choose three.)

A.

Remote Collector

B.

Cloud Connector

C.

Primary

D.

Worker

E.

Data

F.

Secondary

Which actions can be performed on vSphere virtual machine from vRealize Operations Product UI? (Choose three.)

A.

Create virtual machine snapshot

B.

Delete virtual machine snapshot

C.

Move virtual machine

D.

Add virtual disk

E.

Expand virtual disk

F.

Add vCPU

An administrator has been tasked with configuring service discovery to identify which virtual machines are running Active Directory services. All virtual machines are running on vSphere 6.5.

Which credentials, if any, are needed for the administrator to complete this task?

A.

No credentials are needed since credential-less service discovery can be used.

B.

Local Windows administrator account and password.

C.

Active Directory domain administrator account and password.

D.

Active Directory domain user account and password.

During an upgrade of the vRealize Operations cluster via the Administration UI, the cluster has failed, and the status has changed to offline.

Which remediation strategy should be used to manage this problem and continue the installation process?

A.

Manually take the cluster offline, and then select Rollback Installation.

B.

Manually bring the cluster online, and then select Rollback Installation.

C.

Manually take the cluster offline, and then select Finish Installation.

D.

Manually bring the cluster online, and then select Finish Installation.

There is a planned project to move some workloads from a company's vSphere environment, which is running in their data center, to a public cloud. The vSphere environment is being monitored by vRealize Operations. An administrator has been asked to get a monthly cost estimate for running the workloads in a public cloud.

What are two of the public cloud providers that are supported out-of-the-box in vRealize Operations What-If planning for public cloud costs? (Choose two.)

A.

Microsoft Azure

B.

Salesforce Cloud

C.

Oracle Cloud

D.

Alibaba Cloud

E.

Google Cloud

Which two conditions must be met to allow an automated action to be triggered from an alert? (Choose two.)

A.

Within the active policy, the alert definition’s automated setting can remain at the default setting.

B.

Within the active policy, the alert definition’s automated setting must be set to enabled.

C.

The alert will not require an attached recommendation.

D.

The alert must have a recommendation but does not require symptom definitions.

E.

The alert must have a recommendation attached to it.

An administrator has enabled the allocation model in a policy and set the CPU overcommit ratio to 4:1 for all vSphere clusters in a vSphere datacenter.

Why would vRealize Operations report that the cluster has 0 days remaining when the actual CPU overcommit ratio is less than the 4:1 configured value?

A.

The allocation model will always report zero remaining capacity when the actual ratio is less than the configured ratio.

B.

The allocation model does not account for powered off virtual machines.

C.

The CPU demand in the cluster is less than the total CPU capacity.

D.

The CPU demand in the cluster is greater than the total CPU capacity.

Due to multiple hardware failures, several virtual machines were corrupted and are being restored from a recent backup. One of the corrupted virtual machines was the primary replica node of a large production vRealize Operations Manager cluster.

How should the system administrator resolve this availability issue within vRealize Operations Manager?

A.

Remove the corrupted node, and then disable and re-enable vRealize Operations Manager High Availability to reassign the primary replica role to another existing node in the cluster.

B.

Deploy a new vRealize Operations Manager node, and then add it to the existing cluster.

C.

Clone an existing primary vRealize Operations Manager node, and then add it into the vRealize Operations Manager cluster.

D.

Ask the backup administrator to restore the corrupted primary replica node, and then refresh the nodes from the vRealize Operations Manager administrator interface.

An administrator is asked to implement vRealize Operations Cloud.

Which two actions must be used to accomplish this goal? (Choose two.)

A.

Deploy and configure a Primary node.

B.

Sign up for or log in to vRealize Operations Cloud.

C.

Deploy and configure a Replica node.

D.

Deploy and configure a Data node.

E.

Deploy and configure a cloud proxy.