A company has decided to implement Workspace One on premise.
Workspace One portal will be used by end users to simplify access to web, mobile and Windows based applications.
As part of the solution, the company is planning on using Horizon 7 Application Publishing.
Published Applications will be used for applications frequently used by mobile users.
During a proof of concept (POC), users noted that it was too cumbersome to enter Active Directory username and password and RSA SecureID using mobile devices.
The Chief Security Officer (CSO) stated:
Multi-factor is a requirement for a subset of the applications.
End-users must have as seamless as possible authentication using mobile devices.
Which solution can satisfy the CSO’s requirements?
A customer wants to deploy VMware Horizon View to support virtual desktops hosted in two different physical locations and wants users to connect to the location nearest them to start a session.
Which three steps must be completed to enable this functionality? (Choose three.)
A company asked an architect to design a VMware Horizon View 7.1 solution utilizing security servers to support 7500 local network users and 3500 remote sales personnel.
These requirements were requested:
Design must provide high availability
Design must use VMware’s supported minimum number of connection servers
All users will connect with BLAST or PCoIP
Which two minimums can the architect recommend to meet requirements? (Choose two.)
Which ports on a firewall need to be opened to allow client PCoIP traffic to flow from user’s endpoints to a Unified Access Gateway appliance?
A hospital is looking to introduce a new work model. Their goal is to allow doctors and nurses to access care applications more flexibly. An important task is that Android and iOS tablets be allowed for hospital staff. The IT department is faced with the task of executing on the requirements.
The current client environment is:
Physical Windows 7 desktops and laptops
2500 Windows based applications
300 Web based applications, where 200 requires Internet Explorer
Windows applications are managed using Microsoft SCCM
Any solution must be in production within 6 months. IT was approved to start building a non-optimized solution to get things started. At a later date, investments will be spent on optimizing the solution. There is no time for a proper application assessment and user segmentation, so the solution must support as broad a user base as possible.
The main priorities for the design are:
Time to market
Change as little as possible of existing management processes
What solution would support the main priorities?
The IT team at a small government organization wants to deploy Windows RDS desktops to their end users. They want the end users’ profile and application customization setting preserved. They also want to deploy applications using VMware App Volumes.
What should be implemented to meet requirements?
A VDI Architect wants to optimize Blast Extreme protocol between 400 Horizon Windows clients and agents on an organization’s LAN. No GPO currently makes Horizon settings to these clients or agents.
What GPO setting will improve performance of these systems?
A company wants to allow sales personnel to use laptops to access the internal VDI. Due to security constraints, VDI desktop pools for travelers will not be granted access to the Internet. Sales personnel however will be able to access links from email or other documents from their VDI sessions.
What can be implemented to meet these requirements?
Which is a design decision when architecting a Workspace One on-premise implementation supporting Mobile Single-Sign On for iOS devices?
In a local design, a company selected one database instance to be shared by Horizon View Composer database, vCenter external database, and Horizon AppVolumes database. The design must provide High Availability for all databases.
Which two database server options should be selected during physical design creation? (Choose two.)