New Year Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

A.

Depending on the SAP S/4HANA version, there are different SI check frameworks.

B.

The SI checks are executed in the development system and the results are transported into the subsequent systems.

C.

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.

D.

You need to build up a SI check framework by applying SAP notes.

What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

A.

You can verify that the content of the download directory matches the stack XML file.

B.

You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs

C.

You can record the modification adjustment during migration and use the transports in the next runs.

D.

You can find the optimal number of parallel H3load processes by monitoring host performance

What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?

There are 3 correct answers to this question.

Response:

A.

Phases DIFF*

B.

Phase DOWNCONF_DTTRANS

C.

Phase RUN_RSPTBFIL _ISUTABU

D.

Phases EU_IMPORT*

E.

Phase RUN_RSDBSCPY

What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.

A.

You need an SAP system based on AS ABAP 7.50 or above for the SI check framework

B.

The SI checks are executed in the development system and the results are transported into the subsequent systems

C.

The errors from the SI checks must be solved, otherwise. SUM will report an error

D.

You need to build up an SI check framework by applying SAP Notes

What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

A.

Standalone AS ABAP with SAP_BASIS 752 and above

B.

SAP ECC system from SAP ERP 6.0 EHP 8

C.

SAP Solution Manager 7.2

D.

SAP S/4HANA Server 1809 and above

You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

A.

Modification adjustment (SPAU)

B.

Modification adjustment (SPDD)

C.

Activation of dictionary objects (ACT_UPG)

D.

Conversion of application tables (PARCONV_UPG)

You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?

There are 3 correct answers to this question.

Response:

A.

Generation of the new ABAP loads in phase RUN_SGEN_GENER8

B.

Import of upgrade and language data from the download directory in phase TABIM UPG

C.

Activation of dictionary objects in phase ACT_UPG

D.

Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

E.

Import of dictionary objects from the download directory in phase DDIC_UPG

You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?

A.

As part of the cleanup process

B.

Before the downtime starts

C.

Early in the downtime

D.

At the end

What is the benefit of using the file UPGANA.XML from a previous SUM run?

Please choose the correct answer.

Response:

A.

To auto-fill specific fields on selected screens on the SUM UI

B.

To make the progress information within SUM UI more accurate

C.

To repeat specific phases during the SUM run

D.

To skip selected phases during the SUM run

During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?

There are 2 correct answers to this question.

Response:

A.

In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

B.

In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log

C.

In the job log for the corresponding job in SM37 (Job Overview)

D.

In the corresponding R3trans log files of this phase