What is controlled by a schedule line category? (Choose two)

A.

The transfer of requirements

B.

The billing relevance of a material

C.

The determination of the partner determination procedure

D.

The movement type with which stock changes are posted with the goods issue

Which of the following statement is not correct?

Please choose the correct answer.

Response:

A.

Statistical key figures are tracing factor for reposting & allocation of the cost relating to cost center, profit center, Overheads.

B.

We can post both planned as well as actual statistical key figures.

C.

The fixed value statistical key figure is posted in the period in which it is entered.

D.

We can use statistical key figures both as a basis for periodic transactions and for analysis of key figures.

A customer wants to allocate overhead costs to a production order. How can the customer achieve that? (Choose three)

A.

Use routings and work centers.

B.

Define an assessment cycle.

C.

Use a template.

D.

Use a costing sheet.

E.

Use indirect activity allocation.

Which of the following transactions can generate commitments on CO objects automatically? (Choose two)

A.

Purchasing quotation

B.

Purchase order

C.

Purchase requisition

D.

Purchasing contract

What is the maximum number of function modules you can assign to a single follow-up action for the usage decision in the Implementation Guide (IMG)?

A.

Zero

B.

Ninety-nine

C.

Unlimited

D.

One

How does material costing support semi-finished and finished materials that are valuated in stock with consistent valuation strategies per company code?

A.

Costing runs to update the standard prices have to run generally under observation of an external auditor.

B.

You are only allowed to use one single costing variant to update standard prices per period and company code.

C.

You are only allowed to use iterative activity prices in material cost estimates which update standard prices.

D.

You are only allowed to use material cost estimates with quantity structure to update standard prices.

Report Writer library is a collection of?

Please choose the correct answer.

Response:

A.

Characteristics

B.

Basic key figures

C.

Key figures

D.

Report groups

Which of the following support services can you directly access via the SAP Service Marketplace (http://service.sap.com)?

A.

Online conferencing with experts on demand

B.

Execute the SAP remote installation service

C.

System access to SAP hosted solutions

D.

Download SAP upgrade guides

Which of the following statement is correct with reference to activity type?

There are 2 correct answers to this question.

Response:

A.

It classifies the specific activities provided by a cost center along cost allocation line.

B.

It serves as tracing factor for this cost allocation.

C.

The system calculates the associated cost based on the activity price and generates a credit to the receiver and a debit to the sender for both the quantity and the costs.

D.

The internal activity allocation is carried out via primary cost elements, which are stored in master data of the activity type master record.

A certain cost element has conflicting cost center assignments in the Default Account Assignment field (cost element master data) and in the Automatic Account Assignment table (IMG). What happens when a document is posted with this cost element?

A.

The Automatic Account Assignment (IMG) has a higher priority.

B.

An error message is displayed.

C.

The system prompts you in a dialog box.

D.

The Default Account Assignment (cost element master data) has a higher priority.