You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?

A.

Material can be assigned at the order header level.

B.

For stock material you always need a reservation

C.

A goods issue can be entered for planned and unplanned material

D.

The pick list for materials can be printed before order release.

Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

A.

Technical objects

B.

Work orders and operations

C.

ESRI Maps

D.

Cost analytics

E.

Breakdown analytics

You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

A.

Scheduling period

B.

Start counter reading

C.

Estimated annual performance

D.

Counter overflow reading

You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question

A.

Assign the header material of a material BOM as assembly to a task list operation.

B.

Assign the BOM usage for free assignment of material in Customizing

C.

Assign the header material of a material ROM to the assembly field of the task list header

D.

Assign a piece of equipment with allocated material BOM to a task list operation.

The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

A.

Planned date of the next call, independent of maintenance order dates

B.

Actual finish date of the maintenance order

C.

The date of the final confirmation

D.

Technical completion date of the maintenance order

Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question

A.

SAP Service and Asset Manager provides single sign-on functionality.

B.

SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP

C.

SAP Service and Asset Manager can be used offline.

D.

SAP Service and Asset Manager is available only for the iOS platform.

E.

SAP Service and Asset Manager can run on smart watches.

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

A.

Cancel status Released.

B.

Change the pronty

C.

Book a goods receipt.

D.

Change the estimated costs.

The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question?

A.

A text in the subject long text screen

B.

An entry in the object list

C.

A task in the notification item

D.

An activity in the notification header

What happens if you change the primary key of a functional location?

A.

The user must define a new labelling system for the new primary key.

B.

The functional location cannot be assigned to a new superior functional location when the new label is entered.

C.

Changing the superior functional location via alternative labeling is not possible.

D.

The user must decide whether the functional location is assigned to a new superior functional location.

How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question

A.

Via cost center assigned to a personnel number

B.

Via cost center and activity type

C.

Via organizational unit and personal hourly rate

D.

Via activity type and hourly rate