Which Maintenance, Repair, and Overhaul (MRO) parts planning processes are included in SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question.

A.

Inventory Optimization

B.

Demand Driven Replenishment

C.

Demand Planning

D.

Supply Planning

E.

SAP Intelligent Asset Management

You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2 correct answers to this question.

A.

Set up a two-tier landscape and have the configuration for the development system regularly updated from the production system

B.

Create additional planning areas in the test system to support training needs

C.

Create additional test planning areas in the production system to support cutover needs

D.

Set up a three-tier landscape using transport, starting from the development system to test and production

Which of these conditions must be met to create a Local Member key figure? Note: There are 2 correct answers to this question.

A.

Use Excel Cell reference in the Report Editor option is selected

B.

Users should have authorization for template administration

C.

Activate Local Member recognition setting is selected

D.

A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel

Which processes are running in sample planning areas SAP6 and SAP3?(Choose three)

A.

Supply and Allocation Planning

B.

Inventory Optimization

C.

Demand Sensing

D.

Sales and Operations Planning

Which sourcing methods are required to identify the product flow through the network? Note: There are 3 correct answers to this question.

A.

Sourcing via Production

B.

Sourcing via Demand Prioritization

C.

Unspecified Sourcing

D.

Customer Sourcing Rule

E.

Sourcing via Costs

A time profile is defined with these levels: day, technical week, week, month, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?

A.

IF("PERIODID2" = "PERIODID2CU PERIODID2CU PERIODID2CU"...)

B.

IF("PERIODID4" = "PERIODID4CU PERIODID4CU PERIODID4CU"...)

C.

IF("PERIODID3" = "PERIODID3CU PERIODID3CU PERIODID3CU"...)

D.

IF("PERIODID1" = "PERIODID1CU PERIODID1CU PERIODID1CU"...)

You need to work in two separate sessions for two different SAP IBP tenants. What can help you differentiate the appearance of their user interfaces? Note: There are 2 correct answers to this question.

A.

Define a different default planning area via the User Preferences

B.

Have a different set of tiles in the Home group of apps

C.

Set a separate theme for the Home page in the Web UI

D.

Add the system name and tenant information from the About section to the Home pages

What function would you use to configure a year-to-date calculation?

A.

Rolling Aggregation

B.

Last Period Aggregation

C.

Cumulative Aggregation

D.

Dynamic Rolling Aggregation

You need to use your resource cost-effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question.

A.

Excess stock can be generated and will need to be staged in an overflow warehouse

B.

Capacity leveling will be possible for production and storage resources

C.

Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs

D.

Minimum capacity utilization will result in pull production

How do you achieve rolling aggregation with SAP IBP?

A.

Using an attribute as a key figure

B.

Using an appropriate period weight factor

C.

Using a key figure calculation

D.

Using a local member