New Year Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

The new SRE team is advocating against a fixed Error Budget.

Why are fixed Error Budgets better?

A.

They create more toil

B.

They encourage working in smaller batches that reduces risk

C.

Fixed Error Budgets are never exceeded

D.

They help predict outages

Which of the following BEST completes the definition of a canary release?

“A new set of features is released…”

A.

using a rolling wave technique

B.

first to a small group of users

C.

to one small group after another

D.

first to a trial test environment

Which of the following communication and collaboration practices BEST contribute to the effectiveness of the SRE team?

A.

Project managers share limited data only upon request.

B.

Data is flowing freely within and around the SRE team.

C.

Data in SRE should be managed separately from others.

D.

Team members should manage their own data discretely.

Why is observability potentially better than traditional monitoring?

A.

Observability is less expensive than traditional monitoring

B.

Traditional monitoring does not adapt well to the cloud since it focuses on discrete components and applications

C.

Traditional monitoring can struggle to scale when service growth is rapid

D.

Traditional monitoring cannot support containers

Identify the defense-in-depth (DiD) layer where data flows in from, and out to, other networks, including the Internet.

A.

Host layer

B.

Physical layer

C.

Perimeter layer

D.

Data layer

Why is it important to have the future growth envelope outlined?

A.

To ensure only signed artifacts are deployed

B.

To ensure that the service can meet current and future scale estimates

C.

To review Service Level Objectives and Service Level Indicators

D.

To review or revise Error Budgets

Who codifies software-defined networks (SDNs) and applies SDLC principles to build, test and deploy network changes?

A.

Site Reliability Engineer (SRE)

B.

Network Reliability Engineer (NRE)

C.

Customer Reliability Engineer

D.

Database Reliability Engineer

A team has exceeded their error budget by 10% in a particular month.

Give an example of what should happen next as a consequence.

A.

Sprint planning may only pull post-mortem action items from the backlog

B.

The Error Budget is reviewed to determine if it was realistic for the product or timeline

C.

The Error Budget is extended for another month to determine if this breach was an anomaly

D.

The error budget is ignored in subsequent months as it is creating the wrong kind of behavior

What metrics will embracing failure help to improve?

A.

Mean time to detect and mean time between system incidents

B.

Change lead time and change failure rate

C.

Empirical test data and mean time to recover service

D.

Mean time to detect and mean time to recover

Which of the following terms is BEST described by the definition below?

“The probability that the system will meet certain performance standards and yield correct output for a specific time.”

A.

Availability

B.

Reliability

C.

Durability

D.

Throughput