An administrator is deploying an application that requires maximum I/O throughput for scratch data. The administrator is concerned that the throughput requirement is greater than what can be provided by a single cluster node.
What should the administrator do to meet this requirement?
After installation, network ports are properly configured with the default active-backup bonding. One 10GbE port goes to switch 1, and another 10GbE port goes to switch 2.
A consultant tests failover by manually disconnecting one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should be enabled to resolve this issue?
The following alert appears on the file server alerts tab in the file server dashboard:

Which two events can generate this alert? (choose two)
A consultant is working to setup the network before starting the Foundation process.
How should the consultant complete this task?
An administrator is deploying Nutanix Files 3.5 and needs to configure the sizing of the FSVMs for an increased number of concurrent SMB connections over the default 750.
What should the administrator do?
An administrator is deploying a new application to a Nutanix Enterprise Cloud. The application requires a security to prevent unauthorized access. The application also uses many non-standard ports that are unique to it. Security should not be changed for existing applications.
What should the administrator do to meet these requirement?
A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:
* One rack with a total of 5U available
* Two ToR switches with 14 total available ports
* Dual PDUs with six available sockets
What will prevent the consultant from successfully installing the cluster?
During a six-node cluster deployment, one node fails to image successfully and Foundation is unable to automatically configure the cluster. The consultant decides to manually complete cluster formation with the successful nodes, then expand the cluster with the remaining unconfigured node.
Which command should be used to begin the process?
A consultant deployed a Nutanix Files cluster using separate networks for client and storage.
For testing a SMB standard share, a VM has been deployed on storage network. However, the consultant cannot access the share.
What is the cause of the issue?
A VM is exhibiting one or more of the following baseline values based on the past 30 days:
• CPU usage < 20%
• CPU ready time < 5%
• Memory usage < 50% (moderately) or < 20% (severely)
• Memory swap rate = 0 Kbps
Which type of VM is being described?