As a part of a cluster deployment test plan, a customer asks the consultant for some additional performance and resiliency tests.
How should the consultant best satisfy this request?
Where can a consultant find Nutanix Enablement Starter Packs (ESPs)?
The networking team makes changes to the Top of Rack switches to which the Nutanix cluster are attached. A few VMs are able to communicate with each other on the same node but are unable to connect to other parts of the network.
What is the likely cause of this issue?
A customer has the following requirement for a Nutanix cluster:
Must support high-performance Nutanix Volumes iSCSI workloads
Must utilize AHV nodes
Must use 10 GbE interface
How should the customer optimize networking?
A consultant creates a four-node AHV cluster with two 1GbE (eth0, etc1) and two 10GbE (eth2, eth3) NICs per node. The 1GbE NICs will not be placed into service, but the customer wants the network to be preconfigured for their eventual use.
The consultant removes the 1GbE NIC from the default bond and creates a second bridge(br1), but is unable to add the 1GbE NIC using the below command:
manage_ovs –bridge_name br1 –interfaces 1g –bond_name br1-up update_uplinks
Which parameter is missing from this command?
To prepare for a new Nutanix installation, a consultant downloads the Foundation VM, imports the VM to their Desktop Virtualization Solution, and powers on the VM. The IPv4 static address on the host workstation and the Foundation VM have been configured, but pings between them fail.
Which two troubleshooting steps should the consultant perform? (Choose two.)
A consultant is deploying a Nutanix cluster at a customer location. The consultant will be deploying the latest AOS along with the latest Nutanix hardware.
Which three references should the consultant review prior to this installation? (Choose three.)
What reference materials should be provided to the customer during the Knowledge Transfer?
An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.
How should the administrator perform this task?
A consultant is completing final network failover testing on a recently deployed AHV cluster.
The cluster consists of the following:
•Three nodes
•Two uplinks connected to two switches
•Supported SFPs
The consultant removed one SFP+ out of each node. Two of the nodes (Hostl I Host2) failed over to the backup NIC correctly without any interruption but have lost communication with the third node (Host 3) hypervisor/CVM. Inserting the original SFP+ back into the problematic node allowed the network to be connected and the two healthy nodes could communicate successfully again.
manage_ovs showjnterfaces output
manage_ovs showjinterfaces output:
name mode link speed
cthO 10000 True 10000
ethl 10000 False None
eth2 10000 True 10000
eth3 10000 False None
manage_ovs show.uplinks output:
Bridge: brO
Bond: brO-up
bond_mode: active-backup
interfaces: ethl ethO
lacp: off
lacp-fa I 1 back: false
lacp_speed: slow
What should the consultant validate first?