A 15 kW array has a PR of 0.88 and 1600 kWh/m²/year insolation. What is the annual output?

A.

19,800 kWh

B.

21,120 kWh

C.

22,440 kWh

D.

24,000 kWh

Aerial lifts used to hoist equipment and PV modules to roof levels may be field modified for uses other than those intended by the manufacturer with which approval or certification?

A.

Certified in writing by the manufacturer or an NRTL

B.

Certified via the state material handling safely statutes

C.

Approval by the local AHJ for meeting safely regulations

D.

Tested and approval by the distributor of the equipment

A 10 kW system has a PR of 0.82 and operates at 4.8 PSH. What is the monthly output?

A.

984 kWh

B.

1080 kWh

C.

1181 kWh

D.

1296 kWh

A 5 kW system has a daily output of 20 kWh at 5 PSH. What is the total derate factor?

A.

0.75

B.

0.80

C.

0.85

D.

0.90

While surveying a potential three-phase project, an installer measures the voltage at the point of utility interconnection. The results are as follows:

* Phase to phase: 240V

* Phase A neutral: 120V

* Phase B neutral: 208V

* Phase C neutral: 120V

Which is a likely cause of these reading?

A.

Supply-side ground fault

B.

Phase-to-phase power imbalances

C.

High-leg transformer configuration

D.

Missing ground in the transformer

Inspection of a new PV installation shows that the dwelling uses a galvanized water pipe for its grounding electrode and that the PV system now shares the connection. Which of the following is an acceptable supplemental electrode method to ensure the integrity of having a grounding electrode?

A.

Connecting the water pipe to the service entrance panel metal structure

B.

Connecting the water pipe to a gas pipe that is known to be solidly grounded

C.

Connecting the service panel to an auxiliary ground used by a lightning protection system

D.

Connection the service panel to a copper-clad steel ground rod near the panel

Which of the following tests measures axial uplift when performing load testing of driven-pile foundation members

A.

Resistance to horizontal movement

B.

Resistance to downward (Sinking force

C.

Resistance to twisting

D.

Resistance to withdraw (pull-out) force

Which electrical connection requires the use of a torque device to complete the connection per NEC requirements?

A.

Crimp-on log to the battery cable

B.

Screw terminals on an ac receptacle outlet

C.

Underground direct-burial twist-on wire connector

D.

Soldered splices in a conduit body

During a PV system inspection, an installer notices that the rapid shutdown system fails to de-energize the array within 30 seconds of initiation. What is the most likely cause based on NEC 690.12 requirements?

A.

The rapid shutdown switch is installed more than 10 feet from the array

B.

The system lacks a compatible rapid shutdown device

C.

The inverter is not listed for rapid shutdown compliance

D.

The array conductors exceed the maximum allowable voltage

A PV technician is installing a 6.5KWac inverter using a 40A backfed breaker. The single line shows a 200A panelboard with a 200A breaker, but the installer finds that the panelbord actually has a 150A main breaker. Which of the following is the CORRECT installation option?

A.

Replace the 200A panel with a 150A panel.

B.

Install a 30A backfed circuit breaker.

C.

Change the main circuit breaker to a 200A unit.

D.

Complete the installation as noted above.