Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? [K2]
a. Regression tests run and passed in systems testing
b. Incidents closed in systems testing
c. Planned tests run and passed in system testing
d. Planned tests run and passed at all levels of testing
e. Incidents raised and closed at all levels of testing
Which of the test cases below will exercise both outcomes from decision 2? [K3]
Refer to the exhibit
Which of the following is a white box testing design characteristic?
Which of the following risks represents the highest level of risk to the project?
What content would be in an incident report if that incident report was based on the IEEE 829 Standard for SoftwareTest Documentation?
(i)Identification of configuration items of the software or system.
(ii)Software or system lifecycle process in which the incident was observed.
(iii)Description of the anomaly to enable reproduction of the incident.
(iv)Number of occurrences of the incident.
(v)Classification of the cause of the incident for metrics and for reporting purposes.
Number of correct answers: 1
Component testing may include:
The four test levels defined for a common V-model testing approach are:
What are metrics NOT used for?
What can testing demonstrate?
Which of the following is a valid objective of testing? [K1]