Month End Sale Special - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sntaclus

You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.

What are two requirements? (Choose two.)

A.

The CHBs must be updated first.

B.

The Microprocessor utilization should be below 50%.

C.

The Cache Write Pending rate should be below 30%.

D.

There should be no sparing processes running in the background.

The SVP of a VSP G900 system failed and you have been asked to replace it.

Which two items must be available to perform the replacement? (Choose two.)

A.

the iso file with the correct version of Hitachi Ops Center

B.

the iso file with the correct version of the Windows operating system

C.

the microcode iso file with the correct software versions

D.

the Hitachi Remote Ops Monitor Agent iso file

What are two functions of the LAN Blade in the VSP Midrange family? (Choose two.)

A.

It provides the LAN connection to the file module.

B.

It provides the maintenance port connecting to the MPC.

C.

It provides the iSCSI connection to the servers.

D.

It provides the management port connecting to the customer LAN.

Which program is used to perform the “New Installation” procedure on a VSP midrange system?

A.

MPC

B.

Webconsole

C.

GUM

D.

BECK

You need to replace a failing power supply (PS) in a VSP E590.

What is the correct procedure?

A.

Check if the status of the PS is blocked, and if yes, then replace it directly.

B.

Use the Maintenance Utility for blocking the PS, then replace it.

C.

Use the Maintenance Utility for blocking the controller, then replace the PS.

D.

Use the MPC for blocking the PS, then replace it.

What are two valid back-end SAS cable connections on a VSP midrange system? (Choose two.)

A.

from DKA to DKB

B.

from ENC to ENC

C.

from DKB to ENC

D.

from DKA to SSW

Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.

What should you do next?

A.

Enable Port Security.

B.

Enable Host Group security.

C.

Create a Host Group.

D.

Scan for all WWNs.

A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.

What is the valid CFM configuration?

A.

two BM35 per controller

B.

two BM45 per controller

C.

one BM45 per controller

D.

two BM35 per system

Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

A.

Perform Self-Service Maintenance.

B.

Manage virtual storage machines.

C.

Manage multiple VSP Midrange storage systems.

D.

Configure the Hitachi Remote Ops Monitor Agent.

You are installing a VSP F370 and you need to connect your laptop to one of the controllers.

What are the two default IP addresses of the maintenance ports of CTL1 and CTL2? (Choose two.)

A.

10.0.0.17

B.

10.0.0.16

C.

192.168.0.17

D.

192.168.0.16