Multiple approval levels for a small purchase request is an example of which type of waste?
A construction organisation requires specialist equipment for digging deep foundations. Which of the following circumstances would result in the hire of equipment rather than leasing it?
For which of the following is the ‘delphi method’ used?
Which of the following is an acquisition cost under the concept of the total cost of ownership?
In ABC analysis, category C is also known as...?
XYZ Inc opens a tender to purchase new forklift trucks for their new established warehouse. In the final round, there are two suppliers remain who offer two different bids. Supplier A's bid has high initial investment. After calculating the net present value, the NPV in year five is positive. On the other hand, supplier B's bid has low purchase price, with the NPV in year five is negative. If the NPV is the sole selection criterion, XYZ Inc should select the bid which has...?
Which type of codes can a barcode laser scanner (linear scanner) read?
Resevoir Inc runs several oil refineries across the country. These refineries require heavy invest-ment, particularly in maintenance, repair and operating (MRO) inventory. But the inventory turno-ver rate of these MRO items are low, while some items have expired date, which increases the risks of obsolescence. Which of the following methods can address the issues of these MRO items?
XYZ Ltd is a retailer in the US. Their customers' demand for Thanksgiving and Christmas decora-tions usually rises in the end of the year. This irregular demand results in more required storage space for finished goods during peak seasons. Which of the following are possible solutions for dealing with required additional space?
1. Maximising aisle width
2. Keeping high buffer stock throughout the year
3. Maximising flexibility in warehouse layout
4. Installing mezzanine floor
XYZ Ltd has been adopting MRP system for years. The system helps the company improve effi-ciency greatly and generates huge cost-savings. However, MRP system is only limited to produc-tion process management and XYZ management team would like to have better insights into re-sources required across the organisation as a whole. Which software system would help XYZ management team achieve the above objective?