In the context of risk, which of the following is considered a hazard?

A.

The possible occurrence of an event

B.

The probable occurrence of an event

C.

The difference between actual and expected losses

D.

A contributing factor to a peril

At a minimum, the Physical Protection System (PPS) procurement package consists of:

A.

Product specs, budgets, and contact information

B.

Contractor reference requirements, functional specifications, and as-built drawings

C.

Contract information and bidders ' instructions, system specifications, and drawings

D.

Training requirements, instruction manuals, and maintenance instructions

Which protocol divides the information into packets, sequentially numbers each packet, and inserts some error control information?

A.

Transmission Control protocol

B.

File Transfer protocol

C.

Information Control protocol

D.

None of the above

The concept of what requires the mobilization of political, financial and industrial resources for the development and production of modern homeland security and defense?

A.

International terrorism

B.

Modern terrorism

C.

Modern Revolutionary

D.

Modern War weapons

Based on their ability to meet the needs of an entire organization, which of the following stakeholders is MOST crucial to engage for a successful operation of an asset protection strategy?

A.

Security

B.

Executives

C.

IT Department

D.

Human resources

Under the principle of agency law, such an assignment transfers the liability for the service from the corporation to the independent contractor with obligations that some cannot be entirely transferred, is called:

A.

Non-delegable duty

B.

Delegable duty

C.

Non-Crime duty

D.

None of the above

Administrative workload is substantially decreased when which service is employed?

A.

Union

B.

Security

C.

Proprietary

D.

Contract

What are the two methods that are readily utilized in magnetometers to detect metal?

A.

Millimeter wave and bi-static wave

B.

Continuous-wave and pulsed-field

C.

Bi-static wave and ultra-static wave

D.

Continuous-wave and bi-static wave

Which type of testing would BEST demonstrate to clients that a completed security system ' s physical and functional requirements comply with the contract requirements?

A.

Site acceptance testing

B.

Post implementation testing

C.

Reliability or availability testing

D.

Pre-delivery or factory acceptance testing

Major outputs of the security system planning phase include definition of stakeholders, which of the following?

A.

Requirements documents, meeting schedules, and cost estimates

B.

Asset lists, organization charts, and facility-specific threats

C.

Vulnerability studies, adversary sequence diagrams, and defenseindepth

D.

Protective force efficiency, assessment or surveillance, and facility-specific threats