The power cable should be marked, at minimum, with which two pieces of information? (Choose two.)
What are the two features of enclosures that optimize adaptability when reconfiguring room layouts?
Which statement describes a difference between fiber and copper cabling?
To maximize the effectiveness of data center supply air distribution, where should perforated tiles in a raised floor environment be placed?
What is the actual vertical hole spacing (center-to-center) based on the EIA-310 standard for one mounting unit or U?
Which three critical functions does grounding serve for a standby generator? (Choose three.)
Which method of heat transfer causes electromagnetic waves?
What are the four operating modes of CRAC units?
Which external factor will affect the level of moisture in the data center?
What is a common concern when specifying the depth of a rack / enclosure?